Zobrazeno 1 - 10
of 21
pro vyhledávání: '"Tee, Boon Tuan"'
Publikováno v:
Journal of Mechanical Engineering. 19:219-232
This paper was aimed at studying the impact of a variable speed drive in tackling the issue caused by an oversized air conditioning system. In this study, oversizing was determined by calculating the actual load demand in an operating air handling un
Autor:
Mohd Arizam Abdul Wahap, Fadhilah Shikh Anuar, Hew Wei Ren, Fatimah Al Zahrah Mohd Saat, Tee Boon Tuan, Ernie Mat Tokit
Publikováno v:
CFD Letters. 13:62-76
Depletion of fossil fuel caused mankind to look for sustainable and green energy resources. The characteristic of hydrokinetic turbine with ability to operate at low head stream and at low cost made it a good choice for use to harness hydro source of
Decarbonizing the building sector is extremely important to mitigating climate change as the sector contributes 40% of the overall energy consumption and 36% of the total greenhouse gas emissions in the world. Net-zero energy buildings are one of the
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::e6ddf7ca386c79a1d00a259eb678e4f7
https://eprints.gla.ac.uk/260000/1/260000.pdf
https://eprints.gla.ac.uk/260000/1/260000.pdf
Publikováno v:
In Data in Brief April 2021 35
Publikováno v:
International Review of Mechanical Engineering (IREME). 12:663
Building information modelling (BIM) is usually implemented for gathering, generating and analysing building information, while providing benefits and enhancements regarding the level of communication between all parties and stakeholders involved. BI
Publikováno v:
The Proceedings of Manufacturing Systems Division Conference. 2018:304
Autor:
Younus Fahad Breesam, Reduan Mat Dan, Tee Boon Tuan, Muhammad Zulfattah Zakaria, Ahmad Zubair Yahaya
Publikováno v:
Jurnal Teknologi. 76
Energy analysis is important to analyze energy consumption pattern, monitoring on how the energy used varies with time in the building and how the system element interrelate. In this case study, a preliminary energy audit is done on lighting and air-