Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Tao-Qing Zhou"'
Publikováno v:
Journal of Computer Science and Technology. 32:1319-1334
The p-center problem consists of choosing a subset of vertices in an undirected graph as facilities in order to minimize the maximum distance between a client and its closest facility. This paper presents a greedy randomized adaptive search procedure
Publikováno v:
Material Engineering and Mechanical Engineering.
Publikováno v:
Key Engineering Materials. :2632-2635
Aiming at some problems in the fields of industry monitoring technology (IMT) such as bad dynamic ability and poor versatility, this paper brought forward a kind of intelligent Status monitoring and Fault diagnosis Network System (SFNS) based on UPnP
Publikováno v:
Material Engineering & Mechanical Engineering - Proceedings of Material Engineering & Mechanical Engineering (Meme2015); 2016, p999-1006, 8p