Zobrazeno 1 - 10
of 48
pro vyhledávání: '"TA Management of Engineering Works 190-194"'
Autor:
Balci, Serife Aytug
discrete parts manufacturing industries. We are motivated by the production environment of Roketsan Missiles Industries Incorporation, operating at Turkish defense industry. Our objective is to minimize the total weighted completion times of the jobs
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12615676/index.pdf
Autor:
Aminbakhsh, Saman
In pursuance of decreasing costs, both the client and the contractor would strive to speed up the construction project. However, accelerating the project schedule will impose additional cost and might be profitable up to a certain limit. Paramount fo
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12615398/index.pdf
Autor:
Yildiz, Acelya Ecem
Due to its high-risk nature, international construction projects are more vulnerable to adverse changes in project environment and company objectives. To achieve successful project outcomes, early provision of risks has a vital place in managing cons
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12615342/index.pdf
Autor:
Bektas, Sinasi
Many factors such as unforeseeable events, managerial or financial problems of Contractor, insufficient technical capacity of Engineer'
s site team and so on may lead to delays in construction projects. Proper analysis of compensability and
s site team and so on may lead to delays in construction projects. Proper analysis of compensability and
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12614791/index.pdf
Autor:
Ghaziani, Aydin
It is a known fact that construction projects do not often complete on time due to several reasons related with the unexpected changes in the project conditions, external factors or performance of project participants. Since construction projects are
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12614595/index.pdf
Autor:
Degerli, Mustafa
In this research, it was mainly aimed to develop an acceptance model for processes, namely the process acceptance model (PAM). For this purpose, a questionnaire, comprising 3-part and 81-question, was developed to collect quantitative and qualitative
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12614321/index.pdf
Autor:
Sivrioglu, Damla
As a part of the quality management, product defectiveness prediction is vital for small software organizations as for instutional ones. Although for defect prediction there have been conducted a lot of studies, process enactment data cannot be used
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12614516/index.pdf
Autor:
Ceyhan, Cumhur
The purpose of this thesis is to examine the hazard identification, risk assessment and related determining controls aspects of occupational health and safety topic, within the framework of a safety management system, for the construction industry. T
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12614159/index.pdf
Autor:
Daneshvar, Maryam
Surrounding business environment, opportunities and requirements of organizations are under constant change. According to the evolutionary economics, organizations continuously make efforts to adapt themselves in line with changing circumstances of e
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12613891/index.pdf
Autor:
Ozleyen, Erdem
The resource-constrained project scheduling problem (RCPSP) aims to find a schedule of minimum makespan by starting each activity such that resource constraints and precedence constraints are respected. However, as the problem is NP-hard (Non-Determi
Externí odkaz:
http://etd.lib.metu.edu.tr/upload/12613795/index.pdf