Zobrazeno 1 - 10
of 58
pro vyhledávání: '"T.M.A Ari Samadhi"'
Publikováno v:
Jurnal Teknik Industri, Vol 20, Iss 1, Pp 73-88 (2018)
This study is inspired by a batch scheduling problem in metal working industry which guarantees to satisfy a due date as a commitment to customers. Actual flowtime adopts the backward scheduling approach and considers the due date. Using the actual f
Externí odkaz:
https://doaj.org/article/a311e3286c4e48feb8a213c730b026e0
Publikováno v:
International Journal of Industrial Engineering Computations, Vol 7, Iss 2, Pp 229-244 (2016)
This paper discusses an integrated model of batch production and maintenance scheduling on a deteriorating machine producing multiple items to be delivered at a common due date. The model describes the trade-off between total inventory cost and maint
Externí odkaz:
https://doaj.org/article/2c09b29c6a874356ac9b2e7c8e7b533a
Publikováno v:
International Journal of Industrial Engineering Computations, Vol 6, Iss 3, Pp 365-378 (2015)
This research discusses an integer batch scheduling problems for a single-machine with position-dependent batch processing time due to the simultaneous effect of learning and forgetting. The decision variables are the number of batches, batch sizes,
Externí odkaz:
https://doaj.org/article/b110a103741249b89d64dfdf3b92c45b
Publikováno v:
Journal of ICT Research and Applications, Vol 8, Iss 3 (2015)
The importance of technology, especially information technology (IT), to businesses is widely accepted. But, different from large enterprises, small and medium enterprises (SMEs) with their limited resources adopted IT slowly. Literature on technolog
Externí odkaz:
https://doaj.org/article/b01e5881b7f2490f9011da0f1cc06586
Seven-waste framework of waste identification and elimination for computer-based administrative work
Publikováno v:
The TQM Journal. 33:773-803
PurposeThis paper tries to generalize business process improvement (BPI) methodology. It utilizes the seven-waste framework as an essential step in the methodology. While the seven-waste concept is usually applied for manufacturing activities, this p
Publikováno v:
Business Process Management Journal. 25:1474-1490
Purpose The purpose of this paper is to formulate a knowledge management strategy model that aligns with the organisational growth stage and the characteristics of the business processes at every growth stage. The difference in characteristics at eac
Publikováno v:
International Journal of Technology, Vol 10, Iss 2, Pp 339-350 (2019)
The assembly sequence planning of a product can be generated through three phases: first, generating precedence constraints; second, searching for assembly sequence alternatives; and third, selecting the best assembly sequence. Assembly sequence gene
Publikováno v:
International Journal of Organizational Analysis. 26:709-727
Purpose This study aims to develop a business process maturity model, especially on operation processes, based on the characteristics of each organisational growth stage, to increase small and medium enterprises (SMEs) growth. With this information,
Publikováno v:
International Journal of Knowledge Engineering. :43-49
Autor:
Amelia Kurniawati, Iwan Inrawan Wiratmadja, Indryati Sunaryo, T.M.A. Ari Samadhi, Praditya Ajidarma
Publikováno v:
Lecture Notes in Mechanical Engineering ISBN: 9789811509490
Sustainability performance is the achievement of an organization in economic, environmental, and social dimensions by considering the interests of stakeholders. Achieving a high sustainability performance is a challenge for not only large industries
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::a69a52176b9b12c02f7ac0b51d8087b9
https://doi.org/10.1007/978-981-15-0950-6_23
https://doi.org/10.1007/978-981-15-0950-6_23