Zobrazeno 1 - 7
of 7
pro vyhledávání: '"T. N. Santos"'
Autor:
V. S. Cavalcante, L. R. Jesus, J. S. M. Melo, A. R. S. Farias, N. M. Pessoa, Ivan dos Santos, V. P. Soares, T. A. S. Ferreira, Ednir Assis Souza, G. C. Santos, T. N. Santos, Vanilton Caetano Soares de Souza, Sandra Silva Xavier, R. S. Chaves, J. R. O. Barbosa, J. Carvalho, E. L. Farias, Rosilene Alves de Almeida, S. S. Santos, Silvia Carvalho, J. L. P. Santos Júnior, A. S. C. Freire, Emerson Alves, D. T. Cotrim, Abel Correia, L. M. Freitas, I. S. Mello, Cláudia Santos de Jesus, Lucas Vicente da Silva
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::68d65489aa9d1157ac5eb35b38637ab0
https://doi.org/10.24824/978655578486.2
https://doi.org/10.24824/978655578486.2
Autor:
Andre Luiz Diniz, T. N. Santos
Publikováno v:
2012 Sixth IEEE/PES Transmission and Distribution: Latin America Conference and Exposition (T&D-LA).
This paper discusses alternative ways of representing line flow limits constraints and linear approximations for transmission line losses in the short term hydrothermal scheduling problem with a dc model of the electrical network. In the first approa
Autor:
T. N. Santos, Andre Luiz Diniz
Publikováno v:
IEEE PES General Meeting.
Static piecewise linear models for hydro production are largely employed when a generation scheduling problem is formulated as a linear or mixed integer optimization program. Even though such models may provide a satisfactory representation of hydro
Autor:
A.L. Diniz, T. N. Santos
Publikováno v:
2009 IEEE Power & Energy Society General Meeting.
We consider the short term hydrothermal scheduling problem, modeled as a deterministic large-scale linear programming problem on a cost minimization basis. The problem is decomposed in time into several subproblems and solved by multi-stage Benders d
Publikováno v:
2008 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America.
The network constrained hydrothermal scheduling problem determines an optimal hourly dispatch considering line capacities and security constraints. The electrical network can be modeled either by a multi-area approach, with only interchange limits am
Autor:
T. N. Santos, A.L. Diniz
Publikováno v:
2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
Multi-stage Benders decomposition (MSBD), also known as dual dynamic programming, has been proposed previously in the literature to solve hydrothermal scheduling problems. The MSBD methodology, contrary to traditional dynamic programming approaches,
Publikováno v:
All Days.
The Sulfate Removal Unit (SRU), a nanofiltration system, reduces seawater's Sulfate ions from approximately 2,800 mg/L for 100 mg/L or less. This technology minimizes the formation of Sulfate scales in the oil production. This process uses pressure a