Autor:
D. Sydor, Steve Merriman, Zhixian Tony Jiao, Ska-Hiish Manuel, Mukesh Nagpal, T. G. Martinich
Publikováno v:
IEEE Transactions on Power Delivery. 37:374-382
On March 31, 2019, a 500 kV air-core, shunt reactor at a large generating station in BC Hydro was damaged shortly after four unit transformers were simultaneously energized from a 500 kV series and shunt compensated line source. Forensic investigatio
Autor:
Mukesh Nagpal, T. G. Martinich, Aurash Alimardani, Hongbo A. Zhang, Ska-Hiish Manuel, Zhixian Jiao
Publikováno v:
IEEE Transactions on Power Delivery. 33:1954-1961
A BC Hydro regional system experienced a blackout after multiple 500 kV lines, sharing the same transmission corridor, were subjected to lightning strikes in the time span of about three minutes. These lines connect two large generating stations, reg
Publikováno v:
IEEE Transactions on Power Delivery. 27:2098-2104
Large induction motors, when they become disconnected from their synchronizing source and isolate with part of the high-voltage system, become self-excited as long as their inertia keeps them spinning and there is enough capacitance from the system t
Publikováno v:
IEEE Transactions on Power Delivery. 21:890-896
Transformers are essential elements, which facilitate the transmission of electric power at high voltages over long distances and transformer energization is a common occurrence. The energization can lead to excessive transient inrush current, especi
Autor:
Tyler Scott, C.F. Henville, Ralph P. Barone, Scott O. McKenzie, Tony Jiao, Mukesh Nagpal, T. G. Martinich
Publikováno v:
2013 IEEE Innovative Smart Grid Technologies-Asia (ISGT Asia).
The cost of interconnection is an important factor in Non Utility Generator (NUG) overall project costs. This cost has to be minimized without compromising the safety or reliability of the transmission system. The lowest cost interconnection is a tra
Publikováno v:
IEEE Transactions on Power Apparatus and Systems. :619-630
An integral part of a subsynchronous resonance analysis is the frequency scan of digital computer models of the network connected to the machines under study to estimate the equivalent driving point impedance over the frequency range of interest (10
Publikováno v:
IEEE Transactions on Power Apparatus and Systems. :1960-1969
A staged phase-to-phase fault was applied to one end of a 500 kV series compensated circuit as part of the specified acceptance tests for the series capacitor bank. This paper summarizes the pre-test planning studies, test execution, and the results