Zobrazeno 1 - 5
of 5
pro vyhledávání: '"T. D. Veselka"'
Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::87a8c1fba88c8aaf5c9991c5471083d3
https://doi.org/10.2172/1005154
https://doi.org/10.2172/1005154
Autor:
T. D. Veselka, L. A. Poch, C. S. Palmer, S. Loftin, B Osiek, null Decision and Information Sciences, null Western Area Power Administration
On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF)
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::b8aa8cd0e2de85e443b0770182c6acf1
https://doi.org/10.2172/975483
https://doi.org/10.2172/975483
Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::2f9dd96d926d1adc236d2122c6f90a4b
https://doi.org/10.2172/977375
https://doi.org/10.2172/977375
Publikováno v:
2009 IEEE Bucharest PowerTech.
The paper presents the methodology adopted for simulating a regional power market within the frame of a feasibility study of a 1200 km long 2000MW trans-border interconnection. The Generation-Transmission Maximization (GTMax) software, which serves a