Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Svein Syltoy"'
Publikováno v:
All Days.
A novel MPD setup has been tested and used at the Kvitebjørn field in the North Sea to make possible the drilling of 8.5″ holes through reservoirs with heavily depleted zones. A central part of the concept has been to use an advanced dynamic flow
Autor:
Knut Steinar Bjorkevoll, Ole Iacob Prebensen, Eric Low, Tore Larsen, Helge Fjeldberg, Steinar Torvund, John Walton McCaskill, Svein Syltoy, Per Cato Berg, Svein Erik Eide
Publikováno v:
All Days.
Drilling wells in high-pressure, high-temperature (HPHT) reservoirs is often characterized by a narrow operating window between formation pore pressure and fracture pressure. Depletion further reduces this window. Managed Pressure Drilling (MPD) prov
Publikováno v:
All Days.
Abstract As part of its objectives to increase recoverable reserves and reduce development costs in Norway's Oseberg field, Norsk Hydro has aggressively employed extended reach horizontal drilling over the past four years. Critical to the success rea