Zobrazeno 1 - 10
of 15
pro vyhledávání: '"Suresh Jacob"'
Autor:
Ahmed Al Sulaiman, Suresh Jacob
Publikováno v:
Day 3 Wed, February 23, 2022.
This paper details a new rigless technique combining water shut-off operation and adding more inflow ports (perfs) in horizontal oil wells completed with inflow control devices (ICDs). The water production is reduced by mechanical isolation of the IC
Publikováno v:
Day 2 Tue, January 14, 2020.
The paper presents an oil well completion integrating multilaterals, intelligent completions, permanent downhole monitoring systems, electric submersible pump (ESP) and a horizontal wellhead system. The reliability of the completion was improved by u
Publikováno v:
Journal of Evidence Based Medicine and Healthcare, Vol 4, Iss 44, Pp 2721-2726 (2017)
BACKGROUND Ostiomeatal complex is the final common pathway for the drainage of secretions from maxillary, frontal, anterior and middle ethmoidal air sinuses. Any obstruction at the ostiomeatal complex region can result in impedance to the free flow o
Publikováno v:
Day 3 Wed, January 31, 2018.
Intelligent Inflow tracer technology can quantify zonal inflow contribution and identify the location of water breakthrough as its' primary monitoring capabilities. A novel chemical tracer system was permanently installed and successfully field teste
Publikováno v:
All Days.
Saudi Aramco has installed over 64 hydraulic wet connect (HWC) tools to combine smart well completions (SWCs) with electrical submersible pumps (ESPs) over the last 6 years. These completions are installed for remote inflow control in Maximum Reservo
Publikováno v:
All Days.
Extended reach wells with thousands of feet of open hole reservoir contact and multilateral wells with 8-10 laterals are becoming common practice as the industry develops tight and difficult reservoirs. Over the years, drilling and well construction
Autor:
Suresh Jacob, Khalid M. Naimi
Publikováno v:
All Days.
Well Completions design is continuously evolving to meet increasing requirements of down hole monitoring and control. The design of well completion has become more sophisticated as these requirements increase. Nowadays in the industry, it is rare to
Publikováno v:
All Days.
This paper describes the design, planning, implementation details and field trial testing of a new generation integrated intelligent completion system in a trilateral well in a field in Saudi Arabia. The system consists of a flow control valve with a
Publikováno v:
All Days.
ABSTRACT Well completions with downhole inflow control technologies are used to defer and control water or gas breakthrough thereby maximizing recovery. Active and passive inflow control devices dominate this technology. The paper presents the perfor
Publikováno v:
All Days.
A dual-reservoir completion using Intelligent Well system together with an electrical submersible pump (ESP) in a high-rate well was recently deployed in one of the large carbonate fields in Saudi Arabia. The well was equipped with ESP to provide art