Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Stepan Mysak"'
Publikováno v:
Energy Engineering and Control Systems. 7:32-37
The goal of the research is to develop the guidelines for increasing the capacity of the operating 300 MW power-generating units by using the allowances assumed at the design computations and manufacture of the power-generating equipment, while prese
Publikováno v:
Eastern-European Journal of Enterprise Technologies. 5:45-50
The object of the research to develop an analytical method for determining the armor wear rate of the drum ball mill was the boiler TP-100 (TP-100A) of the 200 MW power unit of Burshtyn TPP (Ukraine), equipped with two individual dust-preparation sys
Autor:
Stepan Mysak, Taras Voronchak
Publikováno v:
Energy Engineering and Control Systems. 1:19-24
Method for determining mill balls metal deterioration rate in a ball mill KBM 370/850 (Sh-50А) of dust-system of coal-dust boilers TPP-210А and TPP-312 300МW of thermal power plants is described in the paper. The research is aimed at the developme
Autor:
Stepan, Mysak1 s.mysak@yandex.ru
Publikováno v:
Technology Audit & Production Reserves. 2014, Vol. 3 Issue 4(17), p8-11. 4p.