Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Stan Hogben"'
Publikováno v:
All Days.
Abstract The Typhoon Field development required 9,000 psi MAWP flowlines from the four subsea wells to the TLP. An overview is presented of the design, manufacturing and installation of these four flexible flowlines. The flowline design required the
Publikováno v:
All Days.
Abstract This paper describes the design and installation of two 6" high pressure / high temperature flexible pipes in the Marlin field, Gulf of Mexico. These flexible pipes connect the Marlin subsea development to the Marlin TLP one mile away, in 3,