Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Srinivas Rao Kommaraju"'
Autor:
George Pallath, Dharmesh Chandra Pandey, Satinder Malik, Mohammad J M E J Al-Faudari, Abrar Marwan Al-Bahri, Mahmoud Reda, Mohamed Ali, Srinivas Rao Kommaraju
Publikováno v:
Day 5 Fri, October 02, 2020.
Workover operations in shallow low pressure heavy oil unconsolidated sandstone reservoir in Kuwait presents a major challenge due to significant killing fluid loss which causes wellbore plugging, incremental operational costs due to more rig days, ex
Autor:
Ahmad M.H. Al-Naqi, Srinivas Rao Kommaraju, Abrar Marwan Al-Bahri, Mohammad J M E J Al-Faudari, Jose Gregorio Garcia
Publikováno v:
Day 2 Tue, December 11, 2018.
The drilling of shallow horizontal wells in unconsolidated sand formations faces the particular challenge of achieving proper well trajectory, needed that minimizes dog leg severity and if not accomplished can increase well intervention frequency. Th
Autor:
Waleed Al Khamees, Hussain Dashti, Abdullah Al Balam, Srinivas Rao Kommaraju, Dharmesh Chandra Pandey
Publikováno v:
Day 1 Tue, December 06, 2016.
Cold horizontal and vertical producers in a Kuwait heavy oil green field are generally completed with conventional Progressive Cavity Pumps (PCP) which in case of failure a rig work over intervention is required to replace the pump. As part of an ini
Autor:
Srinivas Rao Kommaraju, Al-Naqi Ahmad, Waleed Al-Khamees, Dharmesh Chandra Pandey, Hussain Dashti
Publikováno v:
Day 3 Thu, December 08, 2016.
Sucker Rod Pump (SRP) and Progressive Cavity pumps (PCP) are two proven artificial lift methods used in horizontal wells cold production applications in a heavy oil green field in Kuwait. However, these artificial lift methods have some limitations w
Autor:
Ali Mussaed Al-Rushoud, Jignesh Shah, Mariam Zerai, Abdulmuhsen Yousef Abdulmuhsen Hashim Al-Ali, Hashem Fouzi Al-Abdullah, Srinivas Rao Kommaraju, Prasanna Mali
Publikováno v:
Day 1 Mon, November 14, 2016.
Kuwait Oil Company (KOC) has a vast pool of heavy oil reservoirs. Cost-effective artificial lift technologies, are required to produce these reservoirs, optimally. With this strategic objective, pilot of newly developed ‘ES-HR-PCP’ (Electrical Su