Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Sigurd Myge Erlandsen"'
Autor:
Geir Elseth, Ingvild Berg Martiniussen, Martin Halvorsen, Kristine Årland, Margrete Hånes Wesenberg, Elysio Mendes Nogueira, Sigurd Myge Erlandsen
Publikováno v:
Day 3 Wed, October 05, 2022.
A lean approach for qualification of inflow control is presented, involving full-scale experimental tests. The experimental data are converted into optimized well design by a simple and robust workflow, incorporating internally developed software too
Autor:
Sigurd Myge Erlandsen, Alexandre Bolliger, Susana Vasconcelos Araujo, Cassio Pettan, Ivan Leitão
Publikováno v:
Day 1 Tue, October 24, 2017.
The Peregrino Field is an accumulation of 13-16° API oil in the Carapebus Formation in the Campos Basin and is thereby one of the heaviest oil offshore developments in Brazil. The field was discovered in 1994 and in 2007 Statoil became a Peregrino p
Autor:
Fahad Ahmed Dilib, Kristine Årland, Matthew D. Jackson, Robert Aasheim, Sigurd Myge Erlandsen, Atle J. Gyllensten, Ali Mojaddam Zadeh
Publikováno v:
All Days.
Summary Important challenges remain in the development of optimized control strategies for intelligent wells, particularly with respect to incorporating the impact of reservoir uncertainty. Most optimization methods are model-based and are effective
Autor:
Sigurd Myge Erlandsen
Publikováno v:
All Days.
Abstract An important focus area in StatoilHydro's IOR strategy is ‘efficient drainage of reservoirs’. As the oil industry struggles to improve ultimate recovery and to make marginal projects economical, wells must provide cost-effective means to
Publikováno v:
All Days.
The Application of Intelligent (or Smart) Well Completion Technology (IWT) has not progressed as rapidly as originally expected. This is partly due to management's lack of confidence that the "added value" is sufficient to justify the extra investmen
Autor:
Sigurd Myge Erlandsen
Publikováno v:
All Days.
The Oseberg Field is located offshore Norway 140 km Northwest of Bergen at approximately 100m waterdepth. Including the recently installed Oseberg D gas platform, the field is developed with four offshore installations. The expected reserves estimate