Zobrazeno 1 - 10
of 13
pro vyhledávání: '"Shima Javanmard"'
Autor:
Mohammad Reza Komari Alaei, Mehmet Soysal, Atabak Elmi, Audrius Banaitis, Nerija Banaitiene, Reza Rostamzadeh, Shima Javanmard
Publikováno v:
Mathematics, Vol 9, Iss 15, p 1730 (2021)
The present research addresses the single transportation robot used to alleviate problems of robotic cell scheduling of the machines. For the purpose of minimizing the make-span, a model of mixed-integer linear programming (MILP) has been suggested.
Externí odkaz:
https://doaj.org/article/0bfca82bcf994c0a8eab7ebe60af3c36
Publikováno v:
Operational Research. 22:2245-2280
Satisfying the clients' uncompromising priorities is a challenge for decision makers of organizations that face multiple projects. This paper considers an organization with a multi-skilled workforce working on several predetermined projects under tim
Autor:
Seyed-Ali Sadegh-Zadeh, Sanaz Khanjani, Shima Javanmardi, Bita Bayat, Zahra Naderi, Amir M. Hajiyavand
Publikováno v:
Frontiers in Artificial Intelligence, Vol 7 (2024)
This study addresses the research problem of enhancing In-Vitro Fertilization (IVF) success rate prediction by integrating advanced machine learning paradigms with gynecological expertise. The methodology involves the analysis of comprehensive datase
Externí odkaz:
https://doaj.org/article/b23ae9e515d64e88befd86af454dc1e0
Autor:
Shima Javanmard, Tahmineh Aldaghi
Publikováno v:
Journal of Engineering, Design and Technology.
Purpose This paper aims to evaluate the performance of the Mashhad No. 5 wastewater treatment plant (WWTP) using a combination of data mining (regression) algorithms and artificial neural networks. Design/methodology/approach In this research, the pe
Autor:
Shima Javanmard, Seyed Taghi Akhavan Niaki, Behzad Karimi, Seyyed Masih Miriha, Mahsa Ghare Hasanluo
Publikováno v:
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability. 233:925-942
A nonlinear integer programming model is developed in this article to solve redundancy allocation problems with multiple components having different failure rates in the series–parallel configuration using an active strategy. The main objective of
Autor:
Shima Javanmard, Reza Rostamzadeh, Audrius Banaitis, Atabak Elmi, Mohammad Reza Komari Alaei, Mehmet Soysal, Nerija Banaitiene
Publikováno v:
Mathematics
Volume 9
Issue 15
Mathematics, Vol 9, Iss 1730, p 1730 (2021)
Volume 9
Issue 15
Mathematics, Vol 9, Iss 1730, p 1730 (2021)
The present research addresses the single transportation robot used to alleviate problems of robotic cell scheduling of the machines. For the purpose of minimizing the make-span, a model of mixed-integer linear programming (MILP) has been suggested.
Publikováno v:
Journal of Industrial and Production Engineering. 34:344-361
This research is motivated by the fact that production systems are often not perfect and constraints on delivery due date, storage capacity and order frequency are an integral part of many real-world inventory systems. In this regard, this paper deal
Publikováno v:
Computers & Chemical Engineering. 96:55-68
Many chemical production systems encounter with a functionally flexible workplace which need multi-skilled workers. This research integrates the multi-skilled project scheduling problem with the resource investment problem which aims to obtain concur
Autor:
Shima Javanmard, Sasan Barak
Publikováno v:
International Journal of Production Economics. 222:107494
Outsourcing drives companies to focus on: their capabilities, advantages of external resources, and decreasing overall operational costs. Selecting appropriate alliances, which are aligned with the company’s strategies, establishes a situation thro
Publikováno v:
Computers & Industrial Engineering. 76:204-221
This paper presents a novel bi-objective location-routing-inventory (LRI) model that considers a multi-period and multi-product system. The model considers the probabilistic travelling time among customers. This model also considers stochastic demand