Mehrnoosh Zohrehvandi, Shakib Zohrehvandi, Mohammad Khalilzadeh, Maghsoud Amiri, Fariborz Jolai, Edmundas Kazimieras Zavadskas, Jurgita Antucheviciene
Publikováno v:
Mathematics, Vol 12, Iss 2, p 211 (2024)
The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling problem (PSP) by taking priorities and resource constraints as well as activity preemption in
Externí odkaz:
https://doaj.org/article/cb64dcdb58dc45eaad4e53739a5de86a
Autor:
Shakib Zohrehvandi, Roya Soltani
Publikováno v:
Journal of Project Management, Vol 7, Iss 2, Pp 121-132 (2022)
In the project management, buffers are considered to handle uncertainties that lead to changes in project scheduling which in turn causes project delivery delay. The purpose of this survey is to discuss the state of the art on models and methods for
Externí odkaz:
https://doaj.org/article/fd341a57ea424dea825efa63ae828f53
Autor:
Shakib Zohrehvandi
Publikováno v:
Computers, Vol 11, Iss 2, p 23 (2022)
Given the growing number of development projects, proper project planning and management are crucial. The purpose of this paper is to introduce a heuristic algorithm for scheduling a power plant project construction and project resource management to
Externí odkaz:
https://doaj.org/article/09a3fb2588aa424fa41678bed3e551d8
A fuzzy project buffer management algorithm: a case study in the construction of a renewable project
Publikováno v:
International Journal of Construction Management. 23:2134-2143
Publikováno v:
Engineering, Construction and Architectural Management. 30:1578-1600
PurposeThis research presents a multiproject scheduling and resource management (MPSRM) model that includes an M/M/c/n queue system, a p-hub median model, a parallel machine scheduling and a hub location problem solution method. This research aims to
Publikováno v:
Procedia Computer Science. 204:891-899
Autor:
Shakib Zohrehvandi, Lucia Knapčíková
Publikováno v:
7th EAI International Conference on Management of Manufacturing Systems ISBN: 9783031227189
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::77fcae70d8c813ee783bb34dcb6e2eba
https://doi.org/10.1007/978-3-031-22719-6_14
https://doi.org/10.1007/978-3-031-22719-6_14
Publikováno v:
Engineering, Construction and Architectural Management. 29:716-738
PurposeThe aim of this research is to propose a buffer sizing and buffer controlling algorithm (BSCA) as a heuristic algorithm for calculating project buffer and feeding buffers as well as dynamic controlling of buffer consumption in different phases
Publikováno v:
Procedia Computer Science. 181:277-284
Oil and gas projects are integrated with a huge number of uncertainties due to their unique characteristics, complexities and uncertain environment. The aim of this study is to identify and evaluate the main risks of this type of projects based on th
Publikováno v:
International Journal of Energy Sector Management. 14:1123-1142
Purpose This study aims to introduce an efficient project buffer and resource management (PBRM) model for project resource leveling and project buffer sizing and controlling of project buffer consumption of a wind power plant project to achieve a mor