Zobrazeno 1 - 10
of 109
pro vyhledávání: '"Seyed Mohammad Hassan Hosseini"'
Publikováno v:
IET Renewable Power Generation, Vol 18, Iss 15, Pp 3355-3377 (2024)
Abstract With the growth of the load in the electricity networks, sufficient investment in the generation and lines expansion should be made in order to provide the energy needed by consumers with the lowest possible investment and operation costs. T
Externí odkaz:
https://doaj.org/article/297a05db08094b4889ebc3df007eb9b2
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 33, Iss 4, Pp 1-23 (2022)
This paper aims to introduce a joint optimization approach for maintenance, quality, and buffer stock policies in single machine production systems based on a P control chart. The main idea is to find the optimal values of the preventive maintenance
Externí odkaz:
https://doaj.org/article/9788ca1c41eb4664aed7217217f4e474
Autor:
Behnam Ayyoubzadeh, Sadoullah Ebrahimnejad, Mahdi Bashiri, Vahid Baradaran, Seyed Mohammad Hassan Hosseini
Publikováno v:
International Journal of Sustainable Engineering, Vol 14, Iss 3, Pp 255-279 (2021)
This study addresses a flexible job shop scheduling problem considering the energy tax regulations. We introduce two strategies as reactive scheduling to deal with two different kinds of uncertainty. The first uncertainty is about the start and proce
Externí odkaz:
https://doaj.org/article/1debe26150b140df94231467882f46cc
Publikováno v:
Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī, Vol 18, Iss 56, Pp 129-169 (2020)
Realization of plans and on time demands providing, is nowadays one of the most strategic goals in all production industries. This importance is caused by importance of customer position and also exploitation of resources. In this paper, the aggregat
Externí odkaz:
https://doaj.org/article/2deba855cc14467c9b0b01d6eb771404
Publikováno v:
Sustainability Analytics and Modeling, Vol 2, Iss , Pp 100010- (2022)
This paper aims to tackle bi-objective scheduling problem in a flexible flow shop containing unrelated parallel machines in the first stage. Due to the different technology levels of the parallel machines, their process speeds and production costs va
Externí odkaz:
https://doaj.org/article/38d4636f6b714736bda098c57d27cfff
Publikováno v:
Journal of Optimization in Industrial Engineering, Vol 12, Iss 1, Pp 63-78 (2019)
This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The producti
Externí odkaz:
https://doaj.org/article/29eeb3c7fe95462b9c6bb432241edf53
Publikováno v:
مجله مدل سازی در مهندسی, Vol 15, Iss 51, Pp 85-98 (2017)
Assembly flow shop production system includes two stages. In the first stage that is usually assumed one station with some parallel machines, the parts are processed. The second stage is an assembly station (or line) to assemble the parts and complet
Externí odkaz:
https://doaj.org/article/25b83cb200b84199a583c2350c387d6f
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 32, Iss 2, Pp 0-0 (2021)
The blood supply chain network is an especial case of the general supply chain network, which starts with the blood donating and ends with patients. Disasters such as earthquakes, floods, storms, and accidents usually event suddenly. Therefore, desig
Externí odkaz:
https://doaj.org/article/d3113b039f034517bd9c3fc28c174640
Publikováno v:
چشمانداز مدیریت صنعتی, Vol 4, Iss 4, Pp 31-54 (2015)
One of the major issues in a reverse supply chainmanagement is dealing with returned productsthrough a reverse logistics while considering uncertainty and non-financial performance measures alongside the more traditional financial measures. In this p
Externí odkaz:
https://doaj.org/article/1eaff0889d814d978ae48c5a2b48fffc
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 25, Iss 1, Pp 1-12 (2014)
A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different ki
Externí odkaz:
https://doaj.org/article/29042d07c8ac4312934beab511201e5e