Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Sestak, Josef"'
Autor:
Di Nezza, Pasquale, Carassiti, Vittore, Ciullo, Giuseppe, Lenisa, Paolo, Pappalardo, Luciano Libero, Steffens, Erhard, Bruce, Roderik, Vasilyev, Alexander, Boscolo Meneguolo, Caterina, Bregliozzi, Giuseppe, Gebolis, Piotr Mieczysla, Iadarola, Giovanni, Mether, Lotta, Pigny, Gregory, Popovic, Branko Kosta, Salvant, Benoît, Sestak, Josef, Vollinger, Christine, Zannini, Carlo
"A proposal for an upgraded version of the existing gas injection system for the LHCb experiment (SMOG) is presented. The core idea of the project, called SMOG2, is the use of a storage cell for the injected gas to be installed upstream of the VELO d
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od________65::cea5388943a3e42639f7acc85742ff86
http://cds.cern.ch/record/2651269
http://cds.cern.ch/record/2651269
Starting from December 2018, the Large Hadron Collider (LHC) is going to interrupt its physic operations for more than two years within the period called second long shutdown (LS2). The Compact Muon Solenoid (CMS) experiment will undergo the biggest
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::232e7407dd8ad5c3c1ca0211b062cb12
Autor:
Barnes, Michael, Adraktas, Antonios, Bregliozzi, Giuseppe, DucimetièRe, Laurent, Goddard, Brennan, Salvant, Benoit, Sestak, Josef, Vega Cid, Lorena, Weterings, Wim, Yin Vallgren, Christina
During Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and ele
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::e04ce3a682593b5f7e5a6ee04cb55b0a
http://cds.cern.ch/record/2276060
http://cds.cern.ch/record/2276060
Publikováno v:
Scopus-Elsevier
In April 2015, the Large Hadron Collider (LHC) has entered its second operational period that will last for 3 years with expected end of the operations at the beginning of 2019. Afterward, the LHC will undergo a long shutdown (LS2) for upgrade and ma
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::1619e8273fccdeb6bb715f256a744277
Publikováno v:
Scopus-Elsevier
During the Long Shutdown 1 (LS1), the LHC beam vacuum system was upgraded to minimize dynamic vacuum effects like stimulated desorption and beam-induced electron multipacting. A quality assurance plan was mandatory due to the demanding vacuum perform
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::b3d04f6f32b8bdefe67141e3185c1a1c
http://cds.cern.ch/record/2141871
http://cds.cern.ch/record/2141871
Autor:
Šesták, Josef
This diploma thesis discuss a flow in a vicinity of exhaust valve using computational of fluid dynamics. In a light of current state of the problem solution this approach is forward but very sophisticated. Intention of author is description of multid
Externí odkaz:
http://www.nusl.cz/ntk/nusl-228659