Zobrazeno 1 - 10
of 3 788
pro vyhledávání: '"Sequence-dependent"'
Autor:
Preeti Thareja, Rajender Singh Chhillar, Sandeep Dalal, Sarita Simaiya, Umesh Kumar Lilhore, Roobaea Alroobaea, Majed Alsafyani, Abdullah M. Baqasah, Sultan Algarni
Publikováno v:
Scientific Reports, Vol 14, Iss 1, Pp 1-22 (2024)
Abstract Protein–protein interaction (PPI) prediction is vital for interpreting biological activities. Even though many diverse sorts of data and machine learning approaches have been employed in PPI prediction, performance still has to be enhanced
Externí odkaz:
https://doaj.org/article/e689ee4739794999aa3364f5c1cb7be0
Publikováno v:
Automation, Vol 5, Iss 3, Pp 432-449 (2024)
As the number of end-of-life products multiplies, the issue of their efficient disassembly has become a critical problem that urgently needs addressing. The field of disassembly sequence planning has consequently attracted considerable attention. In
Externí odkaz:
https://doaj.org/article/6fc3336aee0644069672827e9c6964fe
Publikováno v:
Complex & Intelligent Systems, Vol 10, Iss 5, Pp 7009-7031 (2024)
Abstract This paper addresses the economic lot and delivery scheduling problem (ELDSP) within three-echelon supply chains, focusing on the complexities of demand uncertainty, limited shelf-life of products, and sequence-dependency of setups. We devel
Externí odkaz:
https://doaj.org/article/a241c3bdb9c24a3c995f1e3f9eaae62c
Publikováno v:
Complex System Modeling and Simulation, Vol 4, Iss 2, Pp 137-165 (2024)
The hybrid flow shop group scheduling problem (HFGSP) with the delivery time windows has been widely studied owing to its better flexibility and suitability for the current just-in-time production mode. However, there are several unresolved challenge
Externí odkaz:
https://doaj.org/article/6b39d9d985d4421e81aa0cb6bc8dce49
Autor:
Sara Kamran, Javad Behnamian
Publikováno v:
چشمانداز مدیریت صنعتی, Vol 13, Iss 3, Pp 223-248 (2023)
Today, due to some challenges and competition, such as external pressures, factories are forced to reduce production time, traditional centralized production scheduling is not flexible enough to respond to rapid market changes. In such an environment
Externí odkaz:
https://doaj.org/article/0e62e490c88342929fc484924e77b938
Publikováno v:
Complex & Intelligent Systems, Vol 10, Iss 1, Pp 781-809 (2023)
Abstract This paper deals with a reentrant hybrid flow shop problem with sequence-dependent setup time and limited buffers where there are multiple unrelated parallel machines at each stage. A mathematical model with the minimization of total weighte
Externí odkaz:
https://doaj.org/article/889c21a242724d1f90c8607abf9be8b0
Publikováno v:
Data in Brief, Vol 52, Iss , Pp 109946- (2024)
This data article presents a description of a benchmark dataset for the multi-objective flexible job shop scheduling problem in a cellular manufacturing environment. This problem considers intercellular moves, exceptional parts, sequence-dependent fa
Externí odkaz:
https://doaj.org/article/b1bf390c9d0544f7ae331cfc4f615c18
Autor:
Jian-You Xu, Win-Chin Lin, Kai-Xiang Hu, Yu-Wei Chang, Wen-Hsiang Wu, Peng-Hsiang Hsu, Tsung-Hsien Wu, Chin-Chia Wu
Publikováno v:
PeerJ Computer Science, Vol 10, p e1763 (2024)
The manufacturing sector faces unprecedented challenges, including intense competition, a surge in product varieties, heightened customization demands, and shorter product life cycles. These challenges underscore the critical need to optimize manufac
Externí odkaz:
https://doaj.org/article/982ef34374264218a852dc5af6e3be62
Publikováno v:
IEEE Access, Vol 11, Pp 50631-50641 (2023)
As the demand for multi-chip products with high capacity and small size increases, semiconductor packaging facilities have been faced with complicated constraints such as re-entrant flows, sequence dependent setups, and alternative routes, which lead
Externí odkaz:
https://doaj.org/article/eeee4fe469e24024bcb63dfa84e5d5f8
Autor:
Shaoxing Wu, Li Liu
Publikováno v:
IEEE Access, Vol 11, Pp 39726-39737 (2023)
For the green hybrid flow shop scheduling problem considering sequence dependent setup times (SDST) and transportation times, a mixed integer programming model is established with the objectives of minimizing the maximum completion time (makespan) an
Externí odkaz:
https://doaj.org/article/dab3aaf123f04d7ab69fc7157ad87d20