Zobrazeno 1 - 10
of 83
pro vyhledávání: '"Seokwon Jeon"'
Publikováno v:
IEEE Access, Vol 10, Pp 112695-112712 (2022)
It is difficult for tunnel boring machine (TBM) operators to respond for safe and high-efficient construction without accurate reference parameters such as the TBM thrust. A new hybrid model (MRFO-AT-TELM) combining an improved two-hidden-layer extre
Externí odkaz:
https://doaj.org/article/63ba3ecb6a3442fbbe3016cd64cd9635
Publikováno v:
KSCE Journal of Civil Engineering. 26:4338-4358
Publikováno v:
Bulletin of Engineering Geology and the Environment. 80:9049-9069
Rock excavation is a dynamic process where rock is dynamically loaded by mechanical cutting tools. Previous researches have shown that rock strength in dynamic loading is greater than that in static loading. However, existing prediction models for me
Publikováno v:
Episodes. 43:991-1002
Publikováno v:
Arabian Journal of Geosciences. 15
Autor:
Seokwon Jeon, Yudhidya Wicaksana
Publikováno v:
Geosystem Engineering. 23:243-250
This paper presents a study of the mechanical behaviour of rock under dynamic compression loading at intermediate strain rate (ISR). A series of laboratory tests were carried out to obtain dynamic ...
Publikováno v:
Journal of the Korean Society of Mineral and Energy Resources Engineers. 56:582-595
Autor:
Seokwon Jeon, Taehyun Kim
Publikováno v:
Rock Mechanics and Rock Engineering. 52:2207-2226
Discontinuities in rock mass behave as weak planes, and it is crucial to understand their behavior when assessing the stability of underground structures. Shear characteristics of discontinuities are usually affected by the interaction among overburd
Publikováno v:
Frontiers of Rock Mechanics and Sustainable Development in the 21st Century ISBN: 9781003077510
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::fcd8eec394521bd9b88126f29261838c
https://doi.org/10.1201/9781003077510-41
https://doi.org/10.1201/9781003077510-41
Publikováno v:
Journal of Performance of Constructed Facilities. 33
The Mireuksaji stone pagoda (the only remaining building in Mireuksaji temple) has existed for 1400 years. More than half of the Mireuksaji stone pagoda has collapsed. Due to the historical...