Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Scott F. Ashby"'
Publikováno v:
Day 3 Wed, January 31, 2018.
The increasing need for completions to be capable of withstanding higher treating pressures, combined with complex well geometries and cementing requirements, led to the development of a new 4 1/2-in. completion system that includes liner systems to
Autor:
Hamad F. Al-kulaib, Doran Cruickshank, Ali H. Alabdulmuhsin, Jon E. Hansen, Mohammed A. Al-Atwi, Muhammad Gusti Bastisya, Faisal Khan, Scott F. Ashby, Nayef S. Shammari
Publikováno v:
Day 4 Thu, April 27, 2017.
This paper describes a coiled tubing milling operation using fiber optic enabled coiled tubing and downhole tools for real time depth control and downhole monitoring of critical parameters. A description of the technology used, the job design, tool s