Zobrazeno 1 - 10
of 10
pro vyhledávání: '"Sara Reichenbach"'
Publikováno v:
Lecture Notes in Civil Engineering ISBN: 9783031325182
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::c529510409ba0c5f47190446993182f9
https://doi.org/10.1007/978-3-031-32519-9_139
https://doi.org/10.1007/978-3-031-32519-9_139
Publikováno v:
Lecture Notes in Civil Engineering ISBN: 9783031325182
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::07dff35fb79da8afc06e502353a6aa0a
https://doi.org/10.1007/978-3-031-32519-9_21
https://doi.org/10.1007/978-3-031-32519-9_21
Publikováno v:
Polymers; Volume 14; Issue 12; Pages: 2383
Fibre-reinforced polymers (FRPs) are a promising corrosion-resistant alternative to steel reinforcement. FRPs are, however, generally costly and have a high energy demand during production. The question arises whether the high performance of FRPs and
Publikováno v:
Beton- und Stahlbetonbau. 114:790-796
Publikováno v:
IABSE Congress Reports.
With the building industry being one of the main sources of carbon dioxide emission worldwide and concrete being the main construction material, new strategies have to be developed to reduce the carbon footprint thereof. The use of high-performance m
Autor:
Sara Reichenbach, Benjamin Kromoser
Publikováno v:
Journal of Building Engineering. 43:102527
A current evaluation of the building industry shows a very low efficiency regarding material use as well as a low level of automation in production and construction. With the industry additionally facing a scarcity of skilled workers in mechanical en
Publikováno v:
IABSE Congress, New York, New York 2019: The Evolving Metropolis.
Nowadays large box-girder concrete bridges are either built using pre-cast segmental erection or in-situ casting of concrete. Using these methods sets limitations when it comes to construction speed or to segment length due to the weight of full-cast
Autor:
Johann Kollegger, Sara Reichenbach
Publikováno v:
Procedia Engineering. 156:388-394
Due to the very competitive costs compared to in-situ concrete as well as to steel elements, the precise executions and the economic value, precast elements are able to not only reduce the construction period but also reduce construction costs. With
Autor:
Sara Reichenbach, Johann Kollegger
Publikováno v:
Lecture Notes in Civil Engineering ISBN: 9783319789354
The balanced lift method is a building bridge method that was developed at the TU Wien. The most common methods to build bridges are the ones using falsework or the cantilever method, but a rather uncommon method, the lowering of arches is seen as th
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::149cc2720d3682ac189cb14779165eaf
https://doi.org/10.1007/978-3-319-78936-1_15
https://doi.org/10.1007/978-3-319-78936-1_15
Publikováno v:
Scopus-Elsevier
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=dedup_wf_001::43da065152f43d12ff4462bfd5eb06c6
http://www.scopus.com/inward/record.url?eid=2-s2.0-85074453094&partnerID=MN8TOARS
http://www.scopus.com/inward/record.url?eid=2-s2.0-85074453094&partnerID=MN8TOARS