Zobrazeno 1 - 10
of 10
pro vyhledávání: '"Russell Sargent"'
Autor:
Russell, Sargent
Publikováno v:
Journal of Farm Economics, 1967 Aug 01. 49(3), 643-655.
Externí odkaz:
https://www.jstor.org/stable/1236899
Autor:
Russell, Sargent
Publikováno v:
The Journal of Developing Areas, 1969 Jan 01. 3(2), 177-190.
Externí odkaz:
https://www.jstor.org/stable/4189558
Autor:
Manwei Chan, Russell Sargent
Publikováno v:
2020 IEEE Aerospace Conference.
The development of a Rendezvous and Proximity Operations (RPO) guidance algorithm for approaching uncooperative tumbling satellites has multiple purposes including on-orbit satellite servicing, space debris removal, asteroid mining, and on-orbit asse
Autor:
Russell, Sargent
Publikováno v:
Journal of Farm Economics, 1959 Dec 01. 41(5), 1035-1037.
Externí odkaz:
https://www.jstor.org/stable/1235241
Publikováno v:
AIAA Guidance, Navigation, and Control Conference.
Autonomous fault management has recently been identified as a key technology for future space missions in NASA’s 2010 technology roadmap. An innovative approach to vehicle health monitoring (VHM) is proposed using constraint suspension with parity
Publikováno v:
AIAA Modeling and Simulation Technologies Conference.
The last decade has seen a tremendous increase in t he development of algorithms and embedded software using graphical environments. The MathWorks Simulink product family has become the industry standard for dynamic simulation and Model Based Design
Publikováno v:
Infotech@Aerospace
NASA’s 2012 Technology Roadmap identifies autonomous vehicle health monitoring (VHM) as a key technology for future space missions. This paper describes the demonstration of an algorithm for constraint-based VHM software. The VHM approach, referred
Autor:
Ian Mitchell, Christopher Bessette, David Benson, Louis Breger, Renato Zanetti, Russell Sargent, David Woffinden, Joseph Groszkiewicz, Richard Phillips
Publikováno v:
Infotech@Aerospace 2011.
The Orbital Cygnus vehicle is being developed to perform autonomous rendezvous with International Space Station (ISS) and to provide cargo services to the faculty. Safety through fault management has been a primary consideration in the design of the
Autor:
Russell, Sargent
Excerpts from the report: The five New England Federal order markets were chosen for study. The first month for which producer records were available in all of these markets was April 1959. The three-year period July 1, 1959, to June 30, 1962, was se
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::2d4e1cc4c0e179cd7a1495ff9be510bc