Zobrazeno 1 - 10
of 39
pro vyhledávání: '"Ruslin Anwar"'
Publikováno v:
Rekayasa Sipil, Vol 12, Iss 1, Pp 10-14 (2018)
National development requires infrastructure as one of the driving wheel of economic growth. One of the main parts of infrastructure development is the construction of highways. Road construction requires many factors to consider before the developme
Externí odkaz:
https://doaj.org/article/d442e69e373c4b90a75be3f1ff2a3cba
A Fuzzy Approach on Earned Value Method to Evaluate Project Performance in Solojebres Commuter Depot
Publikováno v:
Rekayasa Sipil, Vol 18, Iss 3, Pp 186-194 (2024)
The high level of public interest in using the Solo-Jogja commuter needs to be accompanied by an effort to improve the services and reliability of facilities, one of which is the establishment of a Commuter Depot located at Solojebres Station. In the
Externí odkaz:
https://doaj.org/article/230a6e6d2ab54932bd89e5cffa2956a2
Publikováno v:
Rekayasa Sipil, Vol 18, Iss 3, Pp 281-288 (2024)
Population growth led to massive construction development, with increasing demand every year. One of those demands is housing construction. The high demand for this house has led to the emergence of new contractors on a local scale, with products and
Externí odkaz:
https://doaj.org/article/0965446bd4fa48ce85d319fd8c38a2d2
Publikováno v:
Jurnal Teknik Pengairan, Vol 4, Iss 2 (2014)
This research investigated contribution of sustainable management water resources in the Upstream Lesti Watershed. The main objective of this research predicted recharge of groundwater using water table fluctuation (WTF). The groundwater recharge pre
Externí odkaz:
https://doaj.org/article/389232098e1e487aba1537cc0351d5b9
Publikováno v:
Terrestrial, Atmospheric and Oceanic Sciences, Vol 25, Iss 6, p 881 (2014)
The upstream Lesti watershed is one of the major watersheds of East Java in Indonesia, covering about 38093 hectares. Although there are enough water resources to meet current demands in the basin, many challenges including high spatial and temporal
Externí odkaz:
https://doaj.org/article/1f2c00195b34440f9debd61f37ab0866
Publikováno v:
Civil and Environmental Science. :56-64
To achieve the level of service performance from PDAM Tirta Taman Kota Bontang , obtained based on user perceptions of PDAM Taman Tirta obtained from the results of a questionnaire with a Likert scale using the Importance Performance Analysis (IPA) m
Publikováno v:
International Journal of Science, Technology & Management. 4:1-6
Business actors in the construction sector in the pre-pandemic period showed good performance, the projects obtained were on target, contract values rose, and operating income increased, until stable liquidity there was no minus, so, before the pande
Large-scale building construction projects are carried out to meet community needs. Required a serious management in achieving the desired goals and results. However, in practice, building construction failures are still encountered due to implementa
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::c38ed613b3efd614689c6fdd26ed7651
Autor:
Nur Rohmah Adinda Putri Ningsih, Sukir Maryanto, Rendi Pradila Hab Sari, Yusuf Krishna, Anang Sujoko, Ruslin Anwar, Didik Rahadi Santoso
Publikováno v:
International Journal of Geoinformatics and Geological Science. 9:10-14
Publikováno v:
Journal of Southwest Jiaotong University. 56:794-808
Restrictions on people activities due to COVID-19 have caused many train trips to be canceled. In addition, people are still afraid to use public transportation because it is considered a breeding ground for viruses. Therefore, the protocol for preve