Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Runi Kusumaning Rusdi"'
Publikováno v:
Day 2 Wed, October 13, 2021.
Peciko Field currently produces gas from multilayer sand-prone shallow reservoirs. Therefore, it needs sand control method to unlock these marginal reservoirs through low-cost intervention. Hanging screen has been reviewed as an alternative solution
Publikováno v:
Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020.
South Mahakam (SMK) surface facilities were designed and built at a capacity of 250 MMscfd as defined in Plan of Development. Development sequences were arranged to manage field natural decline in order to keep South Mahakam keep producing at the max
Publikováno v:
Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020.
Liquid loading is a common issue in the production of mature gas wells in lower pressure reservoirs that have gone below dew point pressure or have active water from an aquifer. With additional hydrostatic head inside the tubing column, the well’s