Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Robby Adrian Joesoef"'
Publikováno v:
Jurnal Informatika, Vol 10, Iss 2, Pp 115-119 (2009)
Nowadays, PT. Balatif has the calculation system for production cost that can only include the calculation of cost of materials based on standard Bill of Material (BOM), while record of factory overhead cost, direct labor cost and report that relatin
Externí odkaz:
https://doaj.org/article/8023cc051f8548f3ba01b2b4aa22a46a
Publikováno v:
Jurnal Informatika, Vol 10, Iss 2, Pp 115-119 (2009)
Nowadays, PT. Balatif has the calculation system for production cost that can only include the calculation of cost of materials based on standard Bill of Material (BOM), while record of factory overhead cost, direct labor cost and report that relatin