Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Rex N. Lutz"'
Publikováno v:
Volume 7: Operations, Applications and Components.
The 9977 / 9978 General Purpose Fissile Package (GPFP) was designed by SRNL to replace the DOT 6M Specification Package and ship Plutonium and Uranium metals and oxides. Urethane foam was used for the overpack to ensure the package would withstand th
Publikováno v:
Volume 7: Operations, Applications, and Components.
In order to improve the melt rate of high level waste slurry feed being vitrified in the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) Melter, a melter glass pump (pump 1) was installed in the DWPF Melter on February 10, 2004.
Publikováno v:
Transportation, Storage, and Disposal of Radioactive Materials.
Testing of 6M specification packages, performed in response to concerns over the integrity of the clamp-ring closure, showed that the clamp-ring was unable to retain the top in thirty foot drop tests of packages having the maximum allowed weight (290
Autor:
Allen C. Smith, T. Wu, Narendra K. Gupta, E. T. Ketusky, J. S. Bellamy, D. R. Leduc, Paul S. Blanton, J. L. England, G. A. Abramczyk, T. K. Houghtaling, Rex N. Lutz, R. W. Watkins, D. S. Hoang, Lawrence F. Gelder, Charles A. McKeel
Publikováno v:
Transportation, Storage, and Disposal of Radioactive Materials.
In general, the design process involves envisioning and developing concepts for a component or system, combining these fractions into an integrated whole and evaluating the final design against functional requirements. A major challenge is developing