Zobrazeno 1 - 10
of 432
pro vyhledávání: '"Resource-constrained Project Scheduling Problem"'
Publikováno v:
Scientific Reports, Vol 14, Iss 1, Pp 1-23 (2024)
Abstract Quantum annealing emerges as a promising approach for tackling complex scheduling problems such as the resource-constrained project scheduling problem (RCPSP). This study represents the first application of quantum annealing to solve the RCP
Externí odkaz:
https://doaj.org/article/a78a011db6b5499b87f086b947e7daf6
Publikováno v:
Journal of Modelling in Management, 2024, Vol. 19, Issue 4, pp. 1136-1154.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/JM2-06-2023-0123
Publikováno v:
Journal of Advanced Mechanical Design, Systems, and Manufacturing, Vol 18, Iss 5, Pp JAMDSM0062-JAMDSM0062 (2024)
The workforce scheduling problem for cell production lines has been recognized as one of the significant issues in manufacturing systems. In most of previous studies, complex workers’ operations in a cell such as traveling times of multi-skilled op
Externí odkaz:
https://doaj.org/article/00c949f90b2e4f21b271204e3a7c52d1
Publikováno v:
IEEE Access, Vol 12, Pp 143733-143744 (2024)
The resource-constrained project scheduling problem (RCPSP) poses several challenges for optimizing activity-on-arc network planning. The existing genetic algorithms for solving this problem have high computational complexity and low efficiency in te
Externí odkaz:
https://doaj.org/article/6a6e7b3336244d37b72ff988a2d0fdb5
Autor:
LI Bin, HUANG Qibin
Publikováno v:
Jisuanji kexue yu tansuo, Vol 17, Iss 11, Pp 2620-2639 (2023)
The resource-constrained project scheduling problem is a classic combinatorial optimization problem with a wide range of engineering applications. Since the 1960s, many optimization algorithms have been used to solve this problem, but most intelligen
Externí odkaz:
https://doaj.org/article/9491cf01b5164f96af997f487b0ff82b
Publikováno v:
مطالعات مدیریت راهبردی, Vol 15, Iss 57 (2024)
Considering the key role of storage tank capacity in increasing and sustainability of oil production and preventing daily fluctuations due to production-related operational problems as well as maintaining storage capacity in oil exports, minimizing a
Externí odkaz:
https://doaj.org/article/5da0e11d47cb4ebbb000163923795545
Autor:
Akan, Ercan
Publikováno v:
Business Process Management Journal, 2023, Vol. 29, Issue 4, pp. 1116-1158.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/BPMJ-08-2022-0368
Publikováno v:
IEEE Access, Vol 11, Pp 144928-144938 (2023)
In this work, a constraint programming (CP) formulation of the multi-mode resource-constrained project scheduling problem (MMRCPSP) is proposed for solving the flexible job shop scheduling problem (FJSSP) under the makespan minimization criterion. Th
Externí odkaz:
https://doaj.org/article/3cd517a066114506a5f97d6d535f09c0
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.