Zobrazeno 1 - 10
of 17
pro vyhledávání: '"Renata Schneiderova Heralova"'
Publikováno v:
Acta Polytechnica CTU Proceedings, Vol 33, Pp 552-557 (2022)
The paper describes the innovative methodology for the evaluation of the life cycle of buildings, which will be used in construction projects of Skanska, or other construction companies, in selecting the optimal solution from the point of view of con
Externí odkaz:
https://doaj.org/article/8c6c829ac8414a7e9d9d4d58666b0491
Autor:
Daniel Macek, Renáta Schneiderová Heralová, Eduard Hromada, Stanislav Vitásek, Iveta Střelcová, Lucie Brožová, Jan Pojar
Publikováno v:
Acta Polytechnica CTU Proceedings, Vol 38, Pp 533–538-533–538 (2022)
Cultural heritage monuments are, to a large extent, public goods of collective consumption, and their preservation is in the public interest of the society as a whole. The benefits arising from the owner's investment and resulting from the existence
Externí odkaz:
https://doaj.org/article/66d56690546b4bb5aa0b632a32184370
Autor:
Eduard Hromada, Renáta Schneiderová Heralová, Klára Čermáková, Marian Piecha, Božena Kadeřábková
Publikováno v:
Buildings, Vol 13, Iss 4, p 896 (2023)
The article compares the effects of crisis on the real estate market in two regions of the Czech Republic that differ from a macroeconomic point of view. The region of Prague represents the rich and developed region while the Karlovy Vary region stru
Externí odkaz:
https://doaj.org/article/7c41723e972d47d19eeb966cbdb69fd0
Publikováno v:
Buildings, Vol 14, Iss 5, p 1479 (2024)
This study examines the strategic use of life cycle cost analyses (LCCAs) in the management and conservation of heritage sites, emphasizing the need for comprehensive financial planning. With an increasing number of heritage sites showing signs of de
Externí odkaz:
https://doaj.org/article/e7abf07718e14d589de233c9851dfa25
Publikováno v:
Business & IT, Vol 11, Iss 2, Pp 2-9 (2021)
Sustainability of buildings is a complex term which incorporates many individual factors, solutions, and technologies that are implemented in the building. This paper provides mapping research and investigates the evaluation criteria of individual su
Externí odkaz:
https://doaj.org/article/5e44f71b4ee2461fb4e73a0674e9d4e1
Autor:
Eduard Hromada, Stanislav Vitasek, Jakub Holcman, Renata Schneiderova Heralova, Tomas Krulicky
Publikováno v:
Buildings, Vol 11, Iss 11, p 524 (2021)
The article focuses on highlighting the role of life cycle costing (LCC) in the preparatory and implementation phase of residential projects. It involves the evaluation of several investment scenarios in the pre-investment phase, the choice between v
Externí odkaz:
https://doaj.org/article/cba37356c8ec4d7fbc67b6a81d8327e1
Publikováno v:
Energy Policy. 123:155-166
The EU Member States have adopted the Energy Performance of Buildings Directive (EPBD II) in their legislation. This directive introduces new procedures for evaluating the setting of energy performance requirements for buildings, including the so-cal
Publikováno v:
SHS Web of Conferences, Vol 91, p 01034 (2021)
The article deals with the description of the methodology for calculating the reproduction value of buildings. It is a mathematical model that uses data obtained from a statistical survey and calculates the total reproduction value of buildings from
Autor:
Stanislav Vitasek, Eduard Hromada, Tomas Krulicky, Renata Schneiderova Heralova, Jakub Holcman
Publikováno v:
Buildings; Volume 11; Issue 11; Pages: 524
Buildings, Vol 11, Iss 524, p 524 (2021)
Buildings, Vol 11, Iss 524, p 524 (2021)
The article focuses on highlighting the role of life cycle costing (LCC) in the preparatory and implementation phase of residential projects. It involves the evaluation of several investment scenarios in the pre-investment phase, the choice between v
Autor:
Renata Schneiderova Heralova
Publikováno v:
Procedia Engineering. 196:565-570
The purpose of this paper is to highlight the role of life cycle cost (LCC) analysis in the feasibility study of construction projects, especially in the public sector. Feasibility study is usually conducted in the early phase of construction project