Zobrazeno 1 - 1
of 1
pro vyhledávání: '"Ravida Ayu Anggraeni"'
Publikováno v:
PROZIMA (Productivity, Optimization and Manufacturing System Engineering). 7:1-10
There are main activities of the worker in UD Askan such as splitting the fish, carrying, and lifting the tubs. Work activities are done manually and the production process continually undergoes. The frequency of activity (15 cycles) in a day causes