Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Rattana Watcharanantakul"'
Autor:
Chaiyos Thurawat, Wirot Teeratananon, Tianpan Ampaiwan, Raweewan Carter, Wattanaporn Phaophongklai, Pojana Vimolsubsin, Rattana Watcharanantakul, Haifeng Wang, Trinant Foongthongcharoen, Khairul Anuar Alang
Publikováno v:
Day 2 Wed, August 10, 2022.
The recent development drilling campaign at Mubadala Petroleum's offshore Nong Yao field faced many challenges, one of which is the complexity of the reservoir which consists of mixed sand-shale sequencies with thin sand lobes of varying thicknesses.
Autor:
Silpakorn Dachanuwattana, Theeranun Limniyakul, I Nengah Nuada, Rattana Watcharanantakul, Pattarapong Prasongtham, Ajana Laoroongroj, Sawin Kulchanyavivat, Mukminin Yusuf
Publikováno v:
Day 3 Wed, November 11, 2020.
The development of marginal volumes in the Jasmine field is part of Mubadala Petroleum's overall strategy to extend the field's life. This development is accomplished by progressively exploiting increasingly challenging prospects. This paper highligh
Autor:
Thanakom Trekarnjanavong, Muhammad Triandi, Gagok Santoso, Farid Saifuddin, Phung Nguyen Thanh, Rattana Watcharanantakul, Jacob Doogue, Mukminin Yusuf, Panit Jedsadawaranon, Maurice Edwards, I Nengah Nuada
Publikováno v:
Day 2 Tue, November 08, 2016.
In many infill development scenarios, including those in shallow, heavy oil intervals, horizontal wells are required, and are positioned as high as possible within the reservoir. In other cases, horizontal wells are drilled to tap undeveloped oil in
Autor:
Chris Alan Oglesby, David Reverdito, Maurice Edwards, Hans Peter Henneberg, David William Boardman, Theeranun Limniyakul, Christopher J. Platt, Yarick Ionnnikoff, Jason McClure, Farid Saifuddin, Raweewan Maneejan, Rattana Watcharanantakul, Piyatad Tabmanee
Publikováno v:
Day 3 Wed, November 12, 2014.
The Jasmine Field began production in 2005 with initial estimated recoverable reserves of 7 MMbbls. Appraisal continued after the initial "A" platform commenced operation resulting in significant reserve growth that allowed for the installation of fo