Zobrazeno 1 - 10
of 64
pro vyhledávání: '"Radziszewska-Zielina E."'
Publikováno v:
Archives of Civil Engineering, Vol 65, Iss 2, Pp 133-148 (2019)
Construction projects are characterised by complexity in the technical, organisational and environmental sphere. The organisational complexity of such projects makes it necessary to manage relationships between actors who fulfil various functions. Fo
Externí odkaz:
https://doaj.org/article/24d8b3c1d5564f62b70cb0eae83ab082
Publikováno v:
Archives of Civil Engineering, Vol 65, Iss 1, Pp 181-195 (2019)
The article highlights the fact that numerous key decisions in temporary construction organisations are made as a result of informal, non-contractual relationships between organisation members that are not a result of formal organisational structures
Externí odkaz:
https://doaj.org/article/36e4591b4553483687c98f0b13850f63
Publikováno v:
Archives of Civil Engineering, Vol 65, Iss 1, Pp 197-212 (2019)
A great number of non-functional child care facilities for children up to the age of three have been created in Poland to this day. This state of affairs may be the consequence of the low level of knowledge in this field, as well as few available stu
Externí odkaz:
https://doaj.org/article/1909671f48ba404caf8051c1cb2c6d98
Publikováno v:
Archives of Civil Engineering, Vol 64, Iss 1, Pp 55-71 (2018)
The goal of the article is the diagnosis and presentation of the problems of the selection of construction technologies for buildings being built in the centres of urban agglomerations. The survey and literature studies that were performed show that
Externí odkaz:
https://doaj.org/article/274099149958490ab46f8e553a707d1e
Autor:
Radziszewska-Zielina E., Sroka B.
Publikováno v:
Archives of Civil Engineering, Vol 63, Iss 4, Pp 21-33 (2017)
The paper presents a method of priority scheduling that is useful during the planning of multiple-structure construction projects. This approach is an extension of the concept of interactive scheduling. In priority scheduling, it is the planner that
Externí odkaz:
https://doaj.org/article/a66e941bd9514555ae434919ddaf3524
Autor:
Radziszewska-Zielina E.
Publikováno v:
Archives of Civil Engineering, Vol 62, Iss 2, Pp 167-182 (2016)
The influence that general contractors and subcontractors have on the operation of a company is immense. Keeping this in mind, the authors have decided to develop and algorithm based on the analysis of partnering relations between construction compan
Externí odkaz:
https://doaj.org/article/1c5d82881bf94437994c3afe3946dee7
Autor:
Radziszewska-Zielina E., Szewczyk B.
Publikováno v:
Archives of Civil Engineering, Vol 61, Iss 3, Pp 89-104 (2015)
The article presents the use of the Mamdani fuzzy reasoning model to develop a proposal of a system controlling partnering relations in construction projects. The system input variables include: current assessments of particular partnering relation p
Externí odkaz:
https://doaj.org/article/9e0d7b68fab24194b8ed7cbd5d131e83
Autor:
Radziszewska-Zielina E.
Publikováno v:
Archives of Civil Engineering, Vol 57, Iss 1, Pp 87-118 (2011)
W artykule przedstawiono metodyke badania i oceny relacji partnerskich przedsiebiorstw budowlanych z zastosowaniem statystyki oraz logiki rozmytej. Zaprezentowano wyniki badan przeprowadzonych w polskich, słowackich i ukrainskich przedsiebiorstwach
Externí odkaz:
https://doaj.org/article/a40ef777fef04c6dabfc627f30b8ce3f
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.