Zobrazeno 1 - 10
of 19
pro vyhledávání: '"Rada, Constantin"'
Autor:
Apostu, Izabela-Maria1 (AUTHOR) izabelaapostu@upet.ro, Rada, Constantin1 (AUTHOR) constantin.rada1965@gmail.com, Faur, Florin1 (AUTHOR) florinfaur@upet.ro
Publikováno v:
Mining Revue / Revista Minelor. 2024 Supplement 1, Vol. 30, p17-24. 8p.
Publikováno v:
MATEC Web of Conferences, Vol 373, p 00032 (2022)
Coal mining activity in Jiu Valley is approaching, faster than expected a few years ago, to its end and one of the main directions for transforming the area (while ensuring its sustainability) is the development of tourism. Under these conditions, a
Externí odkaz:
https://doaj.org/article/27531621bca14c72a65dbf443d9311ec
Autor:
APOSTU, Izabela-Maria1 izabelaapostu@upet.ro, RADA, Constantin1 constantin.rada1965@gmail.com, LAZĂR, Maria1 florinfaur@upet.ro, FAUR, Florin1 marialazar@upet.ro, SÎLI, Nicolae2 nikolai42171@gmail.com
Publikováno v:
Mining Revue / Revista Minelor. 2022, Vol. 28 Issue 1, p24-36. 13p.
Publikováno v:
In Atmospheric Pollution Research July 2016 7(4):567-576
Publikováno v:
MATEC Web of Conferences, Vol 342, p 03005 (2021)
The waste dumps resulted from the lignite exploitation activities from Oltenia are constructions that reach, in most cases, impressive dimensions and store large volumes of sterile rocks. Usually, the dumps are arranged and ecologically restored, but
Externí odkaz:
https://doaj.org/article/b7bf8e9a7029465f8cef1594cd13cdc7
Publikováno v:
MATEC Web of Conferences, Vol 342, p 03009 (2021)
In Romania, as in many other countries of the world, there are areas, more or less extensive, which are naturally prone to landslides. Such an area, with great extension, is represented by the Getic Subcarpathians. In general, this predisposition of
Externí odkaz:
https://doaj.org/article/b4faf06adebf4374bfce55b5b8076d4c
Autor:
Rada Constantin, Faur Florin
Publikováno v:
MATEC Web of Conferences, Vol 290, p 11010 (2019)
The mining waste dump has emerged as a result of lignite extraction from Ruget quarry. The waste dump should have 6 steps with a total height of 90 m (as designed), but, at present, only 5 steps have been constructed (in different stages of execution
Externí odkaz:
https://doaj.org/article/687f12f2b34e45f496a0d1c5a0f994fc
Publikováno v:
Inzynieria Mineralna; Jul-Dec2022, Vol. 50 Issue 2, p59-70, 12p
Publikováno v:
Annals of the University of Petrosani Mining Engineering; 2020, Vol. 21, p86-99, 14p
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.