Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Puyong Wang"'
Publikováno v:
Advances in Materials Science and Engineering, Vol 2019 (2019)
With the development of (electrical discharge machining) EDM technology, composite tools with special features gradually replace the traditional single-material tools and have become widely used in specific processing conditions. In order to predict
Externí odkaz:
https://doaj.org/article/50db0b27012247adaf46b69d2401a473
Publikováno v:
Applied Sciences, Vol 6, Iss 2, p 36 (2016)
Parallel analyses about the dynamic responses of a large-scale water conveyance tunnel under seismic excitation are presented in this paper. A full three-dimensional numerical model considering the water-tunnel-soil coupling is established and adopte
Externí odkaz:
https://doaj.org/article/7080d67e063e490d88fb525678f10a60
Publikováno v:
In Journal of Wind Engineering & Industrial Aerodynamics 2010 98(12):881-887
Publikováno v:
Advances in Materials Science and Engineering, Vol 2019 (2019)
With the development of (electrical discharge machining) EDM technology, composite tools with special features gradually replace the traditional single-material tools and have become widely used in specific processing conditions. In order to predict
Publikováno v:
Applied Sciences, Vol 6, Iss 2, p 36 (2016)
Applied Sciences; Volume 6; Issue 2; Pages: 36
Applied Sciences; Volume 6; Issue 2; Pages: 36
Parallel analyses about the dynamic responses of a large-scale water conveyance tunnel under seismic excitation are presented in this paper. A full three-dimensional numerical model considering the water-tunnel-soil coupling is established and adopte
Publikováno v:
Tunnelling and Underground Space Technology. 28:124-134
Structure analysis of the long tunnel is difficult due to the lack of available computing power. Water hammer simulation in the water conveyance tunnel is also complicated because of strong fluid structure interactions (FSIs). In this paper, the mult
Publikováno v:
The Structural Design of Tall and Special Buildings. 22:847-861
SUMMARY Shanghai Center Tower, which is 632 m in height with 126 stories, will be the tallest building in China at the end of 2014. The extreme height of the building combined with the exterior shrink-constructed and torsion-constructed curtain wall
Publikováno v:
Proceedings of the 4th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering 2015.
In EDM, especially in small holes EDM machining, there will be a lot of debris produced which is difficult to remove from narrow gap. If the debris can't be removed in time, it will affect the machining accuracy and efficiency, and sometimes even una