Zobrazeno 1 - 10
of 121
pro vyhledávání: '"Project Management and Scheduling"'
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
EURO-31th European Conference on Operational Research
EURO-31th European Conference on Operational Research, Jul 2021, Athens, Greece
HAL
EURO 2021-31th European Conference on Operational Research
EURO 2021-31th European Conference on Operational Research, Jul 2021, Athens, Greece
EURO-31th European Conference on Operational Research, Jul 2021, Athens, Greece
HAL
EURO 2021-31th European Conference on Operational Research
EURO 2021-31th European Conference on Operational Research, Jul 2021, Athens, Greece
International audience; Integrated problem with transportation and scheduling problems encompasses many constraints including for example the precedence and synchronization constraints between transportation operations and scheduling operations. Exac
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=dedup_wf_001::05082e11e9a6aa19f56ba16ad4ee9add
https://hal.archives-ouvertes.fr/hal-03522019
https://hal.archives-ouvertes.fr/hal-03522019
Autor:
K. Suresh Kannan, M. G. Ranjith Kumar
Planning, scheduling and controlling are more important in the projects. This specialization requires more focused project planning and controlling techniques that prove to be better for certain types of projects. Planning leads to improved performan
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::0da4190ccffc6a4b4336ffedfa3d72bb
Publikováno v:
Proceedings of International Structural Engineering and Construction. 5
A significant proportion of projects across the construction industry fail to meet their planned completion dates, being this a recurrent topic in the project management literature. Multiples causes of project delays have been proposed, however, hard
Publikováno v:
Applied Mathematical Modelling. 34:2044-2058
This paper deals with problems of computing possible values of latest starting times and determining types of criticality for all activities in a network with interval or fuzzy activity durations. Although the problem of computing the latest starting
Publikováno v:
Вестник Санкт-Петербургского университета. Серия 10. Прикладная математика. Информатика. Процессы управления.
Статья посвящена применению методов тропической оптимизации для решения задач сетевого планирования. Рассматривается задача определе
Publikováno v:
Annual International Conference of the German Operations Research Society
Annual International Conference of the German Operations Research Society, Aug 2016, Hambourg, Germany
Operations Research Proceedings 2016
Andreas Fink ; Armin Fügenschuh ; Martin Josef Geiger Operations Research Proceedings 2016, Springer International Publishing, pp.527-533, 2017, 978-3-319-55702-1. ⟨10.1007/978-3-319-55702-1_70⟩
Operations Research Proceedings 2016 ISBN: 9783319557014
OR
Annual International Conference of the German Operations Research Society, Aug 2016, Hambourg, Germany
Operations Research Proceedings 2016
Andreas Fink ; Armin Fügenschuh ; Martin Josef Geiger Operations Research Proceedings 2016, Springer International Publishing, pp.527-533, 2017, 978-3-319-55702-1. ⟨10.1007/978-3-319-55702-1_70⟩
Operations Research Proceedings 2016 ISBN: 9783319557014
OR
International audience; We address the flow shop scheduling problem with two machines and time delays. We dispose of a set J={1,2,...,n} of n jobs that must be executed without preemption on two machines M1 and M2, which can only handle one operation
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::4a5889446f7c58bd52c3007d3e20a6a0
https://hal.archives-ouvertes.fr/hal-01467896
https://hal.archives-ouvertes.fr/hal-01467896
Publikováno v:
Volume: 15, Issue: 4 449-466
Ege Academic Review
Ege Academic Review
This study aims to show how to calculate the critical path and completion time of a real construction project when there exists fuzzy times and aims to compare clarifications methods of α-cut and centroid method concerning this construction problem.
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=tubitakulakb::26b4ee58e22ae94f7d286059b70e72da
https://dergipark.org.tr/tr/pub/eab/issue/39945/474634
https://dergipark.org.tr/tr/pub/eab/issue/39945/474634
Autor:
Joseph G. Szmerekovsky
Publikováno v:
Management Science. 51:629-640
Recent approaches to modeling the client’s payment-scheduling problem allow the client to control both the timing of payments and the completion times of activities. In practice, the activity schedule is typically determined by the contractor rathe
Autor:
Dorota Kuchta
Publikováno v:
Operations Research and Decisions. 1:37-51
The critical chain method is a recent alternative to the traditional critical path method, an alternative which is becoming more and more popular, but still lacks a formal description. It exists more or less on the level of ideas and seems to have qu