Zobrazeno 1 - 10
of 16
pro vyhledávání: '"Proft, Dennis"'
The 3.2 GeV electron accelerator ELSA in Bonn consists of three acceleration stages each interconnected by tunable transfer beamlines. The steering of the electron beam through the transfer line from linear accelerator to the Booster Synchrotron is c
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::a1f90885defd3930531c52a9270b452f
At the Electron Stretcher Facility ELSA in Bonn the first acceleration stage consists of a 3 GHz traveling wave linear accelerator. It was powered by a 25 MW pulsed high power klystron amplifier, which had been in use for the last thirty years. After
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::d0747061d4530ec465491761cd094f82
Autor:
Proft, Dennis, Desch, Klaus, Elsner, Daniel, Frommberger, Frank, Kronenberg, Samuel, Spreitzer, Axel, Switka, Michael
The ELSA facility utilizes several digital cameras for beam profile measurements on luminous screens and synchrotron radiation monitors. Currently a multitude of devices with analog signal output are being replaced in favor of digital outputs, prefer
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::d2a1e8b84d2f76c0348e275ef3598d8b
The electron accelerator facility ELSA at the University of Bonn, Germany, can accelerate and store electrons with a final energy from 0.8GeV up to 3.2GeV. To routinely determine the filling pattern in the storage ring, a new measuring system has bee
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::2eefc0df6568b819701c577342d587ee
Autor:
Hillert Wolfgang, Balling Andreas, Boldt Oliver, Dieckmann Andreas, Eberhardt Maren, Frommberger Frank, Heiliger Dominik, Heurich Nikolas, Koop Rebecca, Klarner Fabian, Preisner Oliver, Proft Dennis, Pusch Thorsten, Roth André, Sauerland Dennis, Schedler Manuel, Schmidt Jan Felix, Switka Michael, Thiry Jens-Peter, Wittschen Jürgen, Zander Sven
Publikováno v:
EPJ Web of Conferences, Vol 134, p 05002 (2017)
The electron accelerator facility ELSA has been operated for almost 30 years serving nuclear physics experiments investigating the sub-nuclear structure of matter. Within the 12 years funding period of the collaborative research center SFB/TR 16, lin
Externí odkaz:
https://doaj.org/article/b3cdb490ffed45e2b1176dfc9410c77c
Autor:
Hillert, Wolfgang, Balling, Andreas, Boldt, Oliver, Dieckmann, Andreas, Eberhardt, Maren, Frommberger, Frank, Heiliger, Dominik, Heurich, Nikolas, Koop, Rebecca, Klarner, Fabian, Preisner, Oliver, Proft, Dennis, Pusch, Thorsten R., Roth, André, Sauerland, Dennis, Schedler, Manuel, Schmidt, Jan Felix, Switka, Michael, Thiry, Jens Peter, Wittschen, Jürgen, Zander, Sven
The electron accelerator facility ELSA has been operated for almost 30 years serving nuclear physics experiments investigating the sub-nuclear structure of matter. Within the 12 years funding period of the collaborative research center SFB/TR 16, lin
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=od_______610::71b86887756cceb341ed06da30e69b91
https://publica.fraunhofer.de/handle/publica/247740
https://publica.fraunhofer.de/handle/publica/247740
Autor:
Proft, Dennis, Hillert, Wolfgang
At the ELSA electron stretcher facility new power supply control units have been commissioned. These require a new software interface for set-point calculation based on the accelerator and timing model. Goal of the new scheme is a strict separation o
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::cf1c20bb80ce8767e2cf4d4ab0c1fea2
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
At the electron stretcher facility ELSA electrons are accelerated with a high ramping speed of 6 GeV/s. This leads to strong requirements on the main magnets power supplies. In particular, any synchronization errors directly result in beam tune shift
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::d96aaaccf24f1a4253f8a31ddc8b9487