Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Priyadarshi H. Sawant"'
Publikováno v:
European Journal of Engineering Research and Science. 3:66-72
This paper describes the application of Monte-Carlo simulations for parameter optimization, uncertainty estimation and sensitivity analysis using hydrological model developed by author [8] for Wardha River basin, Maharashtra, India. The Monte Carlo s
Autor:
Priyadarshi H. Sawant, Abhishek Verma
Publikováno v:
SSRN Electronic Journal.
The construction industry is one of the most risk involving industries in the entire world, because of the involvement of so many different factors at various levels of work process. To minimize the risk project managers, have conventionally prepared
Publikováno v:
SSRN Electronic Journal.
Man has been having commercial freedom of entering into contract, ever since the beginning of Barter system. It was exchange of goods and/or services by people for their convenience. Over a period, it became necessary that the habitat had to grow and
Publikováno v:
Research Journal of Applied Sciences, Engineering and Technology. 7:3797-3802
A geographic information system-based rainfall runoff model that simulate variable source area runoff using topographic features of the basin is presented. The model simulate the flow processes on daily time step basis and has four non linear stores
Publikováno v:
Journal of Architectural Engineering. 22
The green building concept has recently gained momentum, and the success of green projects to a large extent depends on the lifecycle cost. Water conservation components contribute almost 12%–15% to the capital cost of a conventional residential bu
Publikováno v:
IndraStra Global.
Risk is involved in every business, and the construction industry is no exception. Most of the project management issues that impact a project arise from associated uncertainties. The Indian construction industry is worth about $120 billion and this