Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Praisont Prasertamporn"'
Autor:
Kesavan Ramasamy, Adrián Ledroz, Jayaneethe Naranasamy, Manchukarn Naknaka, Praisont Prasertamporn
Publikováno v:
Day 4 Thu, November 14, 2019.
Mubadala Petroleum planned to drill a complex Extended Reach Well (ERD) from an existing platform. To reach the required geological targets, the preferred wellpath was required to pass within close proximity of an adjacent oil producer that had a res
Autor:
Khairul Amir Khazali-Rosli, Mark Arathoon, Chong Chew Hwa, Praisont Prasertamporn, Ezzatul Akmal Muhamad, M Syahmi M Yusof, Nurul Nadia Ezzatty, Shatiskumar Sockalingam
Publikováno v:
Day 3 Thu, March 22, 2018.
Narrow margin procedures incorporating MPD techniques were developed to tackle the challenges of drilling a deepwater well DW-X, offshore Malaysia. The subsurface prognosis had a ‘most likely’ case with a narrow pore pressure – fracture gradien
Autor:
Jia Jun Goo, Praisont Prasertamporn, Ismatul Hani Shada, M Syahmi M Yusof, Mark Arathoon, Nurul Nadia Ezzatty, Khairul Amir Khazali-Rosli
Publikováno v:
Day 1 Tue, November 07, 2017.
Dynamic hydraulics modeling and multi-phase kick tolerance analysis on a narrow margin deepwater well in offshore Malaysia created realistic and accurate pressure predictions, enabling the well to be drilled safely and efficiently and ultimately gave
Autor:
Praisont Prasertamporn
Publikováno v:
International Petroleum Technology Conference.
Conductor jetting has been the preferred installation method for deepwater drilling. This type of installation depends on the skin friction between the conductor and the formation, making axial load capacity the critical success factor. Failure of ax
Publikováno v:
All Days.
In 2013, PTTEP drilled a deepwater well in the Gulf of Martaban, Myanmar. The water depth was 1003m with riserless drilling over 1000m below seabed. Being exploration well without any reliable offset well, shallow hazards risk was high. Shallow hazar
Publikováno v:
All Days.
The first PTTEPI deepwater well in 1,003m water was drilled in the Gulf of Martaban, Myanmar in 2013. The tight deepwater rig market and single well program made it difficult to secure a rig, but a newbuild 6th generation drillship was eventually con