Publikováno v:
Jurnal Manajemen dan Wirausaha, Vol 13, Iss 2, Pp 135-150 (2011)
There is a natural tendency for a stakeholder groups to try to influence their condition in project success. This presents a challenge for construction project player in analyzing and managing these various concerns and needs in the implementation of
Externí odkaz:
https://doaj.org/article/4b68a8e5df104fa99ea721dde605f705
Publikováno v:
Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS). :121-132
Both initial cost for construction and future costs for operation and maintenance of buildings are very important that must be considered by the building owner. Therefore, estimating Life Cycle Cost (LCC) in long term is a must in determining the amo
Autor:
Peter Kaming
Publikováno v:
Indonesian Journal of Life Cycle Assessment and Sustainability. 1
Analysis of a design process is very important in controlling the initial costs and future costs in possession of an investment project. Therefore, it should be wise to perform a LCC analysis to determine the cost of any category contained in a build