Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Peter Cappadoro"'
Publikováno v:
IEEE Transactions on Applied Superconductivity. 30:1-4
A 3.0 m long In-Vacuum Undulator (IVU) is employed at the National Synchrotron Light Source II (NSLS-II) for the Hard X-ray Nanoprobe (HXN) beamline providing structural and X-ray fluorescence imaging with world-leading spatial resolution. On July 1
Autor:
David Harder, Peter Cappadoro, Toshiya Tanabe, Marco Musardo, John Escallier, Dean Hidas, Andrew Broadbent, Charles Hetzel, Johnny Kirkland, H. Bassan, Charles Kitegi, B. Kosciuk
Publikováno v:
Journal of Synchrotron Radiation. 24:919-924
The National Synchrotron Light Source (NSLS) ceased operation in September 2014 and was succeeded by NSLS-II. There were four in-vacuum undulators (IVUs) in operation at NSLS. The most recently constructed IVU for NSLS was the mini-gap undulator (MGU
Autor:
Yoshiteru Hidaka, Todd Corwin, Toshiya Tanabe, Marco Musardo, Charles Kitegi, David Harder, Dean Hidas, Huston Fernandes, James Rank, Peter Cappadoro
Publikováno v:
Journal of the Vacuum Society of Japan. 59:205-212
Autor:
Yoshiteru Hidaka, David Harder, Marco Musardo, Peter Cappadoro, Toshiya Tanabe, Huston Fernandes, Todd Corwin, Charles Kitegi, J. Rank
Publikováno v:
Synchrotron Radiation News. 28:39-44
The NSLS-II storage ring completed commissioning in 2014 and all project-beamline IDs have also been commissioned. As of February 2015, six beamlines are about to finish commissioning. By the end of 2015, the ring is expected to store 300 mA with top
Autor:
T. Corwin, D. Hidas, Yoshiteru Hidaka, Toshiya Tanabe, Peter Cappadoro, Marco Musardo, J. Rank, Huston Fernandes, Charles Kitegi, David Harder
Publikováno v:
AIP Conference Proceedings.
National Synchrotron Light Source-II (NSLS-II) is the latest storage ring of 3 GeV energy at the Brookhaven National Laboratory (BNL). The horizontal emittance of the electron beam with the currently installed six damping wigglers is 0.9 nm.rad, whic
Autor:
Peter Cappadoro, Huston Fernandes, Oleg Chubar James Rank, Marco Musardo, David Harder, Toshi Tanabe, Todd Corwin, P. He, Charles Kitegi
Publikováno v:
Journal of Physics: Conference Series. 493:012031
The National Synchrotron Light Source-II (NSLS-II) project is now in the final stage of construction. The Linac, the Booster synchrotron, and the Storage Ring magnets girder assemblies have been installed. The first damping wiggler has been delivered