Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Per Cato Berg"'
Autor:
Erik Sandtorv Pedersen, Jim Turner, John David Downs, Siv Killie Howard, Siri Hagerup-Jenssen, Michael J. Harris, Gunnar Olsvik, Åshild Lauritsen, Nader Behjat, Per Cato Berg
Publikováno v:
SPE Drilling & Completion. 24:15-24
Summary Drilling and completion fluids based on cesium formate brines were selected by Statoil for use in the development of the high-pressure/high-temperature (HP/HT) Kvitebjørn field. CsFo brine was selected primarily to minimize well-control prob
Publikováno v:
All Days.
The paper discusses possibilities, limitations and pitfalls in using advanced real time mathematical models during drilling operations, and in particular the real time calibration of such models vs. available sensor data. Examples from recent MPD ope
Publikováno v:
Journal of Petroleum Science and Engineering. 37:195-212
The complexity of the wells haveincreased significantly inlater years. Reach has more than doubled, and highinclination and fully 3-D well paths are common. However, statistics shows that sidetracking the boreholes due to stuckpipe has also shown a s
Publikováno v:
All Days.
The reasons behind Statoil choosing to include continuous circulation in HPHT Managed Pressure Drilling operations in the Kvitebjørn Field in the North Sea are explained. The paper will also discuss the preparations for the operation and the equipme
Autor:
Knut Steinar Bjorkevoll, Ole Iacob Prebensen, Eric Low, Tore Larsen, Helge Fjeldberg, Steinar Torvund, John Walton McCaskill, Svein Syltoy, Per Cato Berg, Svein Erik Eide
Publikováno v:
All Days.
Drilling wells in high-pressure, high-temperature (HPHT) reservoirs is often characterized by a narrow operating window between formation pore pressure and fracture pressure. Depletion further reduces this window. Managed Pressure Drilling (MPD) prov
Autor:
Michael J. Harris, Aashild Lauritsen, Siv Killie Howard, Siri Hagerup-Jenssen, Jim Turner, Erik Sandtorv Pedersen, Gunnar Olsvik, Per Cato Berg, John David Downs, Nader Behjat
Publikováno v:
All Days.
Drilling and completion fluids based on cesium formate brines were selected by Statoil for use in the development of the high pressure high temperature Kvitebj0rn field. Cesium formate brine was selected primarily to minimize well control problems an
Autor:
Michael J. Harris, Geir Løklingholm, Ole Henrik Jordal, Jim Turner, Arild Saasen, David W. Burkhead, Per Cato Berg, Erik Sandtorv Pedersen
Publikováno v:
All Days.
During the drilling and completion of the Huldra field in the North Sea, high temperature and high pressure conditions were expected and encountered in the reservoir section. The difference between the pore pressure and the fracturing pressure is sma