Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Pedro Andrade de Oliveira"'
Autor:
Wilson Cesar Sant’Ana, Robson Bauwelz Gonzatti, Germano Lambert-Torres, Erik Leandro Bonaldi, Bruno Silva Torres, Pedro Andrade de Oliveira, Rondineli Rodrigues Pereira, Luiz Eduardo Borges-da-Silva, Denis Mollica, Joselino Santana Filho
Publikováno v:
Energies, Vol 12, Iss 11, p 2056 (2019)
This paper presents the development of a peak-shaving equipment, composed by a multilevel converter in a cascaded H-bridge topology and battery banks on the DC links. Between specific time periods, when the demand is higher, the equipment injects act
Externí odkaz:
https://doaj.org/article/fce5ff64ed424d09af0de3670e4e2101
Autor:
Luiz Eduardo Borges da Silva, Pedro Andrade de Oliveira, Wilson Cesar Sant’Ana, Rondineli Rodrigues Pereira, Denis Mollica, Robson Bauwelz Gonzatti
Publikováno v:
IECON
Model Predictive Control (MPC) has proven to be a powerful tool for power converters control. Its fast dynamic response and capability to deal with nonlinear variables has made it a choice for many applications in the power grid, including Cascaded H
Autor:
Luiz Eduardo Borges da Silva, Pedro Andrade de Oliveira, Denis Mollica, Wilson Cesar Sant’Ana, Rondineli Rodrigues Pereira, Robson Bauwelz Gonzatti
Publikováno v:
ISIE
The purpose of the following article is to introduce new students and researchers in the basic concepts of Model-Based Predictive Control when applied to Multilevel Converters. Therefore, the main aspects of the theory are demonstrated, as well as th
Autor:
Rondineli Rodrigues Pereira, Wilson Cesar Sant’Ana, Erik Leandro Bonaldi, Pedro Andrade de Oliveira, Bruno Silva Torres, Germano Lambert-Torres, Luiz Eduardo Borges-da-Silva, Joselino Santana Filho, Robson Bauwelz Gonzatti, Denis Mollica
Publikováno v:
Energies; Volume 12; Issue 11; Pages: 2056
Energies, Vol 12, Iss 11, p 2056 (2019)
Energies, Vol 12, Iss 11, p 2056 (2019)
This paper presents the development of a peak-shaving equipment, composed by a multilevel converter in a cascaded H-bridge topology and battery banks on the DC links. Between specific time periods, when the demand is higher, the equipment injects act