Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Oogoe, Takao"'
Autor:
Furukawa, Kazuro, Akemoto, Mitsuo, Arakawa, Dai, Arakida, Yoshio, Bando, Yusei, Ego, Hiroyasu, Enomoto, Yoshinori, Higo, Toshiyasu, Honma, Hiroyuki, Iida, Naoko, Kakihara, Kazuhisa, Kamitani, Takuya, Katagiri, Hiroaki, Kawamura, Masato, Matsumoto, Shuji, Matsumoto, Toshihiro, Matsushita, Hideki, Mikawa, Katsuhiko, Miura, Takako, Miyahara, Fusashi, Nakajima, Hiromitsu, Natsui, Takuya, Ogawa, Yujiro, Ohsawa, Satoshi, Okayasu, Yuichi, Oogoe, Takao, Rehman, Muhammad Abdul, Satake, Itsuka, Satoh, Masanori, Seimiya, Yuji, Shidara, Tetsuo, Shirakawa, Akihiro, Someya, Hirohiko, Suwada, Tsuyoshi, Tanaka, Madoka, Wang, Di, Yano, Yoshiharu, Yokoyama, Kazue, Yoshida, Mitsuhiro, Yoshimoto, Takashi, Zhang, Rui, Zhou, Xiangyu
Publikováno v:
J. Phys. Conf. Ser. 2420, 2023, 012021
KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time
Externí odkaz:
http://arxiv.org/abs/2207.01192
Autor:
Furukawa, Kazuro, Akemoto, Mitsuo, Arakawa, Dai, Arakida, Yoshio, Bando, Yusei, Ego, Hiroyasu, Enomoto, Yoshinori, Higo, Toshiyasu, Honma, Hiroyuki, Iida, Naoko, Kakihara, Kazuhisa, Kamitani, Takuya, Katagiri, Hiroaki, Kawamura, Masato, Matsumoto, Shuji, Matsumoto, Toshihiro, Matsushita, Hideki, Mikawa, Katsuhiko, Miura, Takako, Miyahara, Fusashi, Nakajima, Hiromitsu, Natsui, Takuya, Ogawa, Yujiro, Ohsawa, Satoshi, Okayasu, Yuichi, Oogoe, Takao, Rehman, Muhammad Abdul, Satake, Itsuka, Satoh, Masanori, Seimiya, Yuji, Shidara, Tetsuo, Shirakawa, Akihiro, Someya, Hirohiko, Suwada, Tsuyoshi, Tanaka, Madoka, Wang, Di, Yano, Yoshiharu, Yokoyama, Kazue, Yoshida, Mitsuhiro, Yoshimoto, Takashi, Zhang, Rui, Zhou, Xiangyu
KEK electron positron injector linac initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::468973b677d7cad7041d5fdd011f3cde
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Miura, Kazuki, Kuniyasu, Y., Kurimoto, Yoshinori, Morita, Yuichi, Naito, Daichi, Oogoe, Takao, Ooya, Kazufumi, Sagawa, Ryu, Shimogawa, Tetsushi
In the J-PARC MR, 96 bending magnets (BMs) are used in total. They are divided into 6 groups of 16 BMs. The 16 BMs in each group are connected in series and driven by a single power supply. Since all 96 BMs are symmetrically located in the ring, the
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::1ecc7b73b12d89c2e54eae6a7aaef120
Autor:
Shirakata, Masashi, Oogoe, Takao
The beam transport line between 3 GeV Rapid Cycling Synchrotron and Main Ring has a beam collimator system in order to improve the quality of injected beam in the main ring. The beam power deposited into the collimators is required to be increased fo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ba728210b874c84a759feb60fc40d8ed
Efforts have been made to reduce the magnetic field ripple of the bending, quadrupole and sextupole magnets of the J-PARC main ring using the trim coils of the magnets. The quadrupole magnet has 24 turn main coil and 11 turn trim coil per pole those
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::a48c04566880d3905b82425cc23b6961
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.