Publikováno v:
EMC Review - Časopis za ekonomiju - APEIRON. 21
This paper extends the general problem of minimizing the total cost of transport on the road network (CNF) by considering the total time, maximum time and total amount of cargo with the longest time. In the literature available to us, models with tim
Publikováno v:
Osječki matematički list
Volume 21
Issue 1
Volume 21
Issue 1
U radu je izložena primjena Čebiševljevih polinoma prve i druge vrste kod dokazivanja ne-racionalnosti nekih vrijednosti trigonometrijskih funkcija. Odnosno, dat je osvrt na određivanja brojeva koji su racionalni višekratnici broja π, a za koje
Autor:
Omer Kurtanović, Admir Kurtanović
Publikováno v:
New Technologies, Development and Application IV ISBN: 9783030752743
This paper extends the general problem of minimizing the total cost of transport on the road network (MCFP or CNF) by considering vehicles (one or more types) for the transport of uniform cargo, total transport time, maximum time and total amount of
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::056e368c51dc982f3beef5b0dbd03818
https://doi.org/10.1007/978-3-030-75275-0_133
https://doi.org/10.1007/978-3-030-75275-0_133
Autor:
Omer Kurtanović
Publikováno v:
New Technologies, Development and Application IV ISBN: 9783030752743
This paper first shown the solution of the model for minimizing project duration without limiting resources using manual procedures and MS Project software on the example of a hypothetical project with a small number of activities that are not allowe
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ca1da7e1dc5b1d126950e5f9f03eed6e
https://doi.org/10.1007/978-3-030-75275-0_134
https://doi.org/10.1007/978-3-030-75275-0_134
Autor:
Fatih Destović, Omer Kurtanović
Publikováno v:
New Technologies, Development and Application II ISBN: 9783030180713
This paper presents the engagement of resources of the type of workers and equipment on the project with their adopted normal working hours and the maximum allowed overtime work. At the same time, the two criteria, the duration and costs of the proje
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ed74e5d92555a136e3c3325e52f5c815
https://doi.org/10.1007/978-3-030-18072-0_38
https://doi.org/10.1007/978-3-030-18072-0_38
Autor:
Omer Kurtanović, Lejla Dacić
Publikováno v:
Lecture Notes in Networks and Systems ISBN: 9783319908922
This paper considers the dependence of the project duration on available resources through the problem of parametric analysis (PA). Vector PA has been presented from the aspect of variants of perturbation directions and intensities for several differ
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ebb6988cc840ea87550d23e125b74936
https://doi.org/10.1007/978-3-319-90893-9_69
https://doi.org/10.1007/978-3-319-90893-9_69