Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Nussbaumer, Rod"'
Autor:
Alcorta, Martin, D'Angelo, Alex, Dale, Don, Hui, Hubert, Humphries, Brandon, Koscielniak, Shane, Langton, Kevin, Lennarz, Annika, Nussbaumer, Rod, Planche, Thomas, Rowe, Mike, Rädel, Stephanie
The commissioning of the Advanced Rare Isotope Electron Linac (ARIEL) facility at TRIUMF is underway. The 30 MeV e-linac has successfully been commissioned to 100 W, and to further increase the power to 1 kW the beam loss monitor system (BLM) for fas
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::48bf5d61170060b594faf3470b1b1d50
Autor:
Carrozza, Saverino, Bastos, Miguel, Bondesan, Luca, Burnet, Jean-Paul, Bylinskii, Yu., Hudson, Gregory, King, Quentin, Le Godec, Gilles, Leung, Arthur, Louie, Dan, Mammarella, Franco, Michels, Olivier, Morato, Alessandro, Nussbaumer, Rod, Pretelli, Miguel, Taddia, Giuseppe, Valencia, Claudio
The new 20 kA, 80 V power supply for the main magnet of the 520 MeV H⁻ Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrate
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::85dd314c1646fa0d8159cc84e0306da3
Autor:
Carrozza, Saverino, Bastos, Miguel, Burini, Filippo, Bylinskii, Iouri, Ferrari, Emilio, Hudson, Gregory, King, Quentin, Le Godec, Gilles, Louie, Dan, Nussbaumer, Rod, Pretelli, Miguel, Taddia, Giuseppe
A sophisticated power supply was studied and de-signed to supply a high current to the main magnet of the TRIUMF cyclotron. The power supply will be operated with a current up to 20000 A in DC mode. It has been designed using a modular approach, with
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::b7419f3f6ae610249b76fa84f27aa934
Autor:
Marchetto, Marco, Ames, Friedhelm, Ang, Zhengting, Baartman, Richard, Bylinskii, Iouri, Chao, Yu-Chiu, Dale, Don, Fong, Ken, Iranmanesh, Reza, Jones, Frederick, Kaltchev, Dobrin, Kavarskas, Julius, Kolb, Philipp, Koscielniak, Shane, Koveshnikov, Alexey, Laverty, Michael, Laxdal, Robert, Merminga, Lia, Muller, Norman, Nagimov, Ruslan, Nussbaumer, Rod, Planche, Thomas, Rowe, Mike, Saminathan, Suresh, Verzilov, Victor, Yao, Zhongyuan, Zheng, Qiwen, Zvyagintsev, Vladimir
ARIEL is the new TRIUMF facility for production of radioactive ion beams that will enable the delivery of three simultaneous RIB beams to the ISAC experimental stations. Two additional target stations will produce beams by using either a 50 kW proton
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::e9e29a1f91fbb8b129864edbf92b9c66
Autor:
Pon, Juan, Ezawa, Keiko, Keitel, Rolf, Nussbaumer, Rod, Richards, Jane, Rowe, Mike, Yogendran, Priscilla
Phase 1 of TRIUMF Advanced Rare Isotope Laboratory (ARIEL) was completed in September 2014. At phase 1, the Low-Level RF (LLRF) system of ARIEL's electron linear accelerator (e-Linac) consists of a buncher and a deflector, one single-cavity injector
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::b6557e0680afe129e29e45089412a040
Autor:
Nussbaumer, Rod, Dale, Don, Ezawa, Keiko, Fong, Ken, Hui, Hubert, Iranmanesh, Reza, Kavarskas, Julius, Morris, David, Pon, Juan, Rapaz, Shawn, Richards, Jane, Rowe, Mike, Tateyama, Tony, Tikhomolov, Evgeniy, Waters, Graham, Yogendran, Priscilla
The Advanced Rare Isotope & Electron Linac (ARIEL) facility at TRIUMF has now reached completion of the first phase of construction; the Electron Linac. A commissioning control system has been built and used to commission the electron e-gun and two s
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::476dab0fb3569b39f521bb8fbd3dfc84