Zobrazeno 1 - 10
of 56
pro vyhledávání: '"Novrianti Novrianti"'
Publikováno v:
Journal of Earth Energy Engineering, Vol 7, Iss 2, Pp 23-32 (2018)
In oil and gas drilling activities, drilling mud is one of the most important commodities. The main mineral used as a reactive solid that works to suck fresh water and form drilling mud is bentonite. Bentonite which is used as a drilling mud in the m
Externí odkaz:
https://doaj.org/article/96986af7351e4551a140ff0acd9151b3
Publikováno v:
Journal of Earth Energy Engineering, Vol 7, Iss 1, Pp 42-46 (2018)
Designing a slurry with adequate strength resistance is a major objective in oil and gas completion job. Various studies and research confirms that Compressive Strength (CS) and Shear Bond Strength (SBS) are two parameter which is imperative in descr
Externí odkaz:
https://doaj.org/article/50206897dc4e49baa49f729d0384a8ea
Autor:
Novrianti Novrianti
Publikováno v:
Journal of Earth Energy Engineering, Vol 6, Iss 2, Pp 1-8 (2017)
Meningkatnya water cut pada sumur MY05 menyebabkan terjadinya penurunan produksi minyak. Untuk mengatasi masalah tersebut, perlu dilakukan pekerjaan squeeze off pada zona perforasi yang mempunyai kontribusi produksi minyak yang rendah dan potensi pro
Externí odkaz:
https://doaj.org/article/34427b9f5bfe493aa517e64a99fea247
Publikováno v:
JGEET: Journal of Geoscience, Engineering, Environment and Technology, Vol 2, Iss 2, Pp 133-136 (2017)
Well X is a development well which is directionally drilled. Directional drilling is choosen because the coordinate target of Well X is above the buffer zone. The directional track plan needs accurate survey calculation in order to make the righ trac
Externí odkaz:
https://doaj.org/article/536df0b53c664749b1f53e2c0f8f4555
Autor:
Novrianti Novrianti, Mursyidah Umar
Publikováno v:
Journal of Earth Energy Engineering, Vol 6, Iss 1, Pp 38-43 (2017)
The cementing process can determine successful oil well when producing oil to the surface. Planning the time required for the cement suspension to achieve consistency of 100 UC (unit of consistency) or thickening time and the maximum limit of water c
Externí odkaz:
https://doaj.org/article/e69f5337cb004c528152cf8bdbc4d33b
Analyzing The Statistics Function For Determination Of Oil Flow Rate Equation in New Productive Zone
Publikováno v:
JGEET: Journal of Geoscience, Engineering, Environment and Technology, Vol 2, Iss 1, Pp 69-75 (2017)
Oil rate will be decline at production time in a well. So, we have to produce in another layer who assume have a potential. Before we produce another layer who assumed have a potential, we need to predict oil rate to known how much oil gain. In this
Externí odkaz:
https://doaj.org/article/def6190e6ae54145b75066b95c9e3314
Publikováno v:
JGEET: Journal of Geoscience, Engineering, Environment and Technology, Vol 2, Iss 1, Pp 64-68 (2017)
Enhancing the cement strength through attaching chemical additive has been popular to meet the required condition for a particular well-cementing job. However, due to a low oil-price phenomenon, pouring and additive should be reconsidered because it
Externí odkaz:
https://doaj.org/article/687e9f60dc4e47f1998a541ef9be6ff6
Autor:
Novrianti Novrianti
Publikováno v:
Journal of Earth Energy Engineering, Vol 5, Iss 2, Pp 57-61 (2016)
The number of production wells refers to the performance of the well, which is shown in the graph of inflow performance relationship (IPR). Reservoir characteristics influence on performance of the well, type of welltest and methods that be used in t
Externí odkaz:
https://doaj.org/article/d33354e219cd46b281ffc97114bd9b57
Autor:
Novia Rita, Novrianti Novrianti
Publikováno v:
Journal of Earth Energy Engineering, Vol 5, Iss 1, Pp 11-20 (2016)
Area X merupakan salah satu area yang terdapat di Lapangan Y PT. Chevron Pacific Indonesia, dimana area X terdiri dari 563 sumur. Pada Area X ini dilakukan pekerjaan tes terhadap sumur sebanyak 2 kali per bulan, sehingga untuk 563 sumur diperlukan 11
Externí odkaz:
https://doaj.org/article/01e766a105374a768932bd34c7045796
Autor:
Novrianti Novrianti
Publikováno v:
Journal of Earth Energy Engineering, Vol 5, Iss 1, Pp 21-27 (2016)
Semen merupakan salah satu parameter penting dalam proses pemboran. Parameter keberhasilan penyemenan sumur migas antara lain
Externí odkaz:
https://doaj.org/article/c222eecef9ec4901b1f4e09e70e0a4b2