Zobrazeno 1 - 10
of 21
pro vyhledávání: '"Nirpeksh Kumar"'
Publikováno v:
Wiley StatsRef: Statistics Reference Online. :1-13
Publikováno v:
Journal of Statistical Computation and Simulation
Journal of Statistical Computation and Simulation, 2022, 92 (7), pp.1457-1486. ⟨10.1080/00949655.2021.1998501⟩
Journal of Statistical Computation and Simulation, 2022, 92 (7), pp.1457-1486. ⟨10.1080/00949655.2021.1998501⟩
International audience; In this paper, we study the performance properties of the phase II exponential chart with an unknown in-control (IC) rate parameter, used to monitor high-yield processes. The average time to signal (ATS) is used as the chart p
Autor:
Nirpeksh Kumar
Publikováno v:
Quality Technology & Quantitative Management. 19:1-18
Publikováno v:
Communications in Statistics - Simulation and Computation. :1-13
Process capability index Cpm, sometimes called Taguchi index, is a widely used measure to assess the ability of a process to cluster around the target. In calculating Cpm, it is assumed that the pr...
Autor:
Ranjeet Singh, Nirpeksh Kumar
Publikováno v:
Sequential Analysis. 39:399-416
Geometric charts have an important role in monitoring fraction nonconforming in high-yield processes where the rate of nonconforming is very low, say, parts per million. Currently, the average numb...
Autor:
Nirpeksh Kumar, Sonam Jaiswal
Publikováno v:
Quality and Reliability Engineering International. 36:2044-2056
Time between events (TBE) control charts play an important role in monitoring high-yield processes. In this article, Phase II Shewhart-type tr-charts, with various runs rules, are considered for monitoring TBE exponential data with a known rate param
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::e33a2d3a843309499ab3dee68e3c2583
Publikováno v:
Quality and Reliability Engineering International. 36:231-246
Autor:
Nirpeksh Kumar
Publikováno v:
Quality Technology & Quantitative Management. 17:285-306
It is now well known that the error in estimating parameter(s) adversely affects the performance of control charts. The charts with estimated control limits are usually assessed by some of characte...
Autor:
Nirpeksh Kumar, Amita Baranwal
Publikováno v:
Quality and Reliability Engineering International. 35:1061-1080