Zobrazeno 1 - 10
of 10
pro vyhledávání: '"Nijaz Mujkanović"'
Autor:
Anđelko Vlašić, Nijaz Mujkanović
Publikováno v:
Građevinar, Vol 69, Iss 05., Pp 367-378 (2017)
Due to bending, flanges of steel box girder cross sections act as compression plates and require stiffeners. Using stability evidence from EN 1993-1-5, a parametric study was performed for six different types of stiffeners. The obtained diagrams show
Externí odkaz:
https://doaj.org/article/1459180ee0f44cc88d8494488eb53cc8
Publikováno v:
Građevinar, Vol 64, Iss 06., Pp 475-484 (2012)
The design solution presented by authors from the Faculty of Architecture and Faculty of Civil Engineering won the first prize award at the international competition organized by the Zagreb Airport. The structure and form of this solution are integra
Externí odkaz:
https://doaj.org/article/3e934e553e004d32a5d86a8449284c52
Over the last 20 years, beside their primary educational activities, members of the Bridge Chair of the Zagreb Faculty of Civil Engineering Structural Department also worked professionally on main and execution designs of many bridges. Most of them a
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::03d59bc410acea9da6a69b75f54b199a
https://www.bib.irb.hr/1121167
https://www.bib.irb.hr/1121167
Autor:
Anđelko Vlašić, Nijaz Mujkanović
Publikováno v:
Građevinar, Vol 69, Iss 05., Pp 367-378 (2017)
Građevinar
Volume 69
Issue 05.
Građevinar
Volume 69
Issue 05.
Uslijed savijanja, pojasnice čeličnih sandučastih presjeka grednih mostova ponašaju se kao tlačni pločasti elementi i zahtijevaju ukrućenja. Koristeći dokaz stabilnosti prema EN 1993-1-5 provedena je parametarska analiza za 6 različitih tipo
Publikováno v:
Future Trends in Civil Engineering.
The Pelješac Bridge is currently the largest bridge under construction in Croatia, but also in the region. The construction began in July 2018 (for the second time), and the bridge should be completed in 36 months. The design of the bridge began in
Publikováno v:
Road and Rail Infrastructure V.
Modern norms define design guidelines for designers and contractors regarding acceptable detailing and manufacturing of bridge orthotropic deck plates. The convenience of these design guidelines is that for most deck elements, a specified detail can
Autor:
Marija Kušter Marić, Gordana Hrelja Kovačević, Ana Mandić Ivanković, Mladen Srbić, Mladen Burić, Stjepko Devald, Anđelko Vlašić, Dominik Skokandić, Nijaz Mujkanović, Joško Ožbolt, Danijel Tenžera, Jelena Bleiziffer, Krunoslav Tepeš, Luka Lacković
Publikováno v:
Road and Rail Infrastructure V.
Condition assessment of six bridges: Maslenica Bridge, Šibenik Bridge, Adriatic Bridge, Bridge of Youth, Homeland Bridge and Žeinci Bridge are presented in the paper. The bridges are of different load-bearing type, age, material and traffic demands
Publikováno v:
Građevinar
Volume 64
Issue 06.
Građevinar, Vol 64, Iss 06., Pp 475-484 (2012)
Volume 64
Issue 06.
Građevinar, Vol 64, Iss 06., Pp 475-484 (2012)
Na međunarodnom natječaju koji je raspisala Zračna luka Zagreb pobijedilo je rješenje autora s Arhitektonskog i Građevinskog fakulteta Sveučilišta u Zagrebu. Konstrukcija i oblik rješenja zajedno su integrirani višedimenzionalnim pristupom u
Publikováno v:
Građevinar
Volume 61
Issue 09.
Volume 61
Issue 09.
Na natječaju raspisanom od Hrvatskih cesta za oblikovanje novoga mosta kopno – otok Čiovo u Trogiru od šest pristiglih radova prvu je nagradu osvojio kontinuirani čelični most. Stari grad u Trogiru pod zaštitom je UNESCO-a, pa su uvjeti natje
Publikováno v:
Građevinar
Volume 61
Issue 09.
Volume 61
Issue 09.
U radu je prikazan i detaljno opisan projekt mosta Pelješac. Mostom preko morskog tjesnaca između Kleka i poluotoka Pelješca, duljine oko 2400 m uspostavit će se čvrsta veza između dijelova hrvatskog teritorija, u svrhu povezivanja i razvitka D