Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Nigel Wayne Nichols"'
Publikováno v:
Journal of Marine Engineering & Technology. 19:78-101
Previously, the action factors, which are generally used in the region of Malaysia is based on the data from the Gulf of Mexico (GoM) or the North Sea, where the environmental condition is much har...
Autor:
Nigel Wayne Nichols, Riaz Khan
Publikováno v:
Journal of Marine Engineering & Technology. 14:61-69
Since 2008, PETRONAS Carigali Snd Bhd (PCSB) has embarked on developing a structural integrity management system (SIMS) within its Malaysian operations, which is compliant with the recently balloted American Petroleum Institute Recommended Practice f
Autor:
Nigel Wayne Nichols, Riaz Khan
Publikováno v:
Encyclopedia of Maritime and Offshore Engineering
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::50b5b6af4e335c753a0855ea2317aae1
https://doi.org/10.1002/9781118476406.emoe409
https://doi.org/10.1002/9781118476406.emoe409
Publikováno v:
Day 3 Thu, March 24, 2016.
Within the oil and gas industry major inconsistencies have been found in the correlation of predicted pile response using design code prescribed methods and the measured response from installed on-line monitoring systems. This paper presents the firs
Autor:
Rohani M.J., Nigel Wayne Nichols, Tom Lunne, Kaushik Mukherjee, M. Sapihie B. Ayob, Carl J.F. Clausen
Publikováno v:
All Days.
Petronas Carigali Sdn Bhd (PCSB) manages about 150 existing platforms at various sites across South China Sea. Integrity reassessment on these existing structures using non-linear pushover analyses has frequently indicated lateral foundation failure
Publikováno v:
All Days.
A large part of the fleet of platforms in Malaysian waters are ageing with the increasing demand of enhancement in view of further oil recovery and the additional development in the extended and nearby field. The enhancement process will also require
Publikováno v:
All Days.
Petronas Carigali Sdn Bhd (PCSB) is currently operating in excess of 150 Platforms. Of these over 60% have been in operation for more than 20yrs, 20% of platforms have already exceeded 30yrs with several others in the very near future reaching their