Zobrazeno 1 - 10
of 56
pro vyhledávání: '"Nerija Banaitiene"'
Publikováno v:
Energies, Vol 14, Iss 22, p 7815 (2021)
This study uses the fuzzy analytical hierarchy process (FAHP) method to prioritize contracting methods to determine the most suitable contract option for water and wastewater projects (WWP). Content analysis, a two-round Delphi survey technique, and
Externí odkaz:
https://doaj.org/article/e745003811bf41f3b25d0424444af644
Publikováno v:
Energies, Vol 14, Iss 21, p 6929 (2021)
Office buildings built before the pre-1960 age constitute a relevant group for analyzing the energy performance of the Portuguese building sector. A dynamic energy simulation was used to assess the energy performance of an existing office building lo
Externí odkaz:
https://doaj.org/article/e53ced1a8f4d46b9b82046dd87e1fc7d
Autor:
Mohammad Reza Komari Alaei, Mehmet Soysal, Atabak Elmi, Audrius Banaitis, Nerija Banaitiene, Reza Rostamzadeh, Shima Javanmard
Publikováno v:
Mathematics, Vol 9, Iss 15, p 1730 (2021)
The present research addresses the single transportation robot used to alleviate problems of robotic cell scheduling of the machines. For the purpose of minimizing the make-span, a model of mixed-integer linear programming (MILP) has been suggested.
Externí odkaz:
https://doaj.org/article/0bfca82bcf994c0a8eab7ebe60af3c36
Publikováno v:
Buildings, Vol 10, Iss 2, p 35 (2020)
This paper aims to identify and investigate the factors affecting the goals of mass-housing building projects due to the use of building information modeling (BIM). A descriptive-survey method was used to collect necessary data. Fifty respondents fro
Externí odkaz:
https://doaj.org/article/d288cc4686e34575a3587575b0f2f4a0
Autor:
Hadi Sarvari, Alireza Valipour, Nordin Yahya, Norhazilan MD Noor, Michael Beer, Nerija Banaitiene
Publikováno v:
Administrative Sciences, Vol 9, Iss 1, p 17 (2019)
The complexity of public⁻private partnership (PPP) projects ensures that risks could emerge and spread in unpredictable ways if they are not well identified and managed. The emergence of PPP projects has brought major changes in the construction in
Externí odkaz:
https://doaj.org/article/b380d83af10f4b66b53cb5ee43f28dd5
Publikováno v:
Energies; Volume 14; Issue 21; Pages: 6929
Energies, Vol 14, Iss 6929, p 6929 (2021)
Repositório Científico de Acesso Aberto de Portugal
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
Energies, Vol 14, Iss 6929, p 6929 (2021)
Repositório Científico de Acesso Aberto de Portugal
Repositório Científico de Acesso Aberto de Portugal (RCAAP)
instacron:RCAAP
Office buildings built before the pre-1960 age constitute a relevant group for analyzing the energy performance of the Portuguese building sector. A dynamic energy simulation was used to assess the energy performance of an existing office building lo
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::b8627569fdba650c891be4badcc30af3
http://hdl.handle.net/10198/24143
http://hdl.handle.net/10198/24143
Publikováno v:
Built Environment Project and Asset Management
PurposePrivatization is a complex issue in many developing countries; therefore, it is vital to examine the obstacles that prevent its proper implementation. The goal of this study is to identify and analyze the barriers to private sector investment
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::19692586eee21a9cf49db7a3c337995c
http://livrepository.liverpool.ac.uk/3105979/1/Manuscript.pdf
http://livrepository.liverpool.ac.uk/3105979/1/Manuscript.pdf
Publikováno v:
Buildings, Vol 10, Iss 2, p 35 (2020)
Buildings; Volume 10; Issue 2; Pages: 35
Buildings; Volume 10; Issue 2; Pages: 35
This paper aims to identify and investigate the factors affecting the goals of mass-housing building projects due to the use of building information modeling (BIM). A descriptive-survey method was used to collect necessary data. Fifty respondents fro
Publikováno v:
Technological and Economic Development of Economy; Vol 26 No 1 (2020); 258-270
Technological and Economic Development of Economy, Vol 26, Iss 1 (2020)
Technological and Economic Development of Economy, Vol 26, Iss 1 (2020)
This study empirically investigates (for the period of 1983–2017) the relationships between the parameters (labour wage (LW), labour productivity (LP) and unemployment (UNM) rate) of the construction sector in New Zealand. This study employs the Jo
Publikováno v:
Energies; Volume 14; Issue 22; Pages: 7815
Energies, Vol 14, Iss 7815, p 7815 (2021)
Energies, Vol 14, Iss 7815, p 7815 (2021)
This study uses the fuzzy analytical hierarchy process (FAHP) method to prioritize contracting methods to determine the most suitable contract option for water and wastewater projects (WWP). Content analysis, a two-round Delphi survey technique, and