Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Nazim Sami"'
Publikováno v:
European J. of Industrial Engineering. 14:1
This paper addresses the chain-reentrant flow shop scheduling problem with two machines and n non-preemptive jobs in the presence of the no-wait constraint; we assume that each job passes from the first machine to the second and returns back to the f
Publikováno v:
European J. of Industrial Engineering. 14:573